Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Issue Section
Date
Availability
1-3 of 3
Keywords: reclamation
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Ground Improvement (2005) 9 (1): 23–31.
Published: 01 January 2005
...M. W. Bo; V. Choa; K. S. Wong In recent years more and more reclamations have been carried out on waste ponds or mine tailing ponds. The deposits in these ponds are ultra-soft and may still be undergoing self-weight consolidation. Reclamation and soil improvement works in these areas are very...
Journal Articles
Proceedings of the Institution of Civil Engineers - Ground Improvement (2004) 8 (4): 151–169.
Published: 01 January 2004
...A. Arulrajah; H. Nikraz; M. W. Bo The ongoing Changi East Reclamation Project in Singapore consists of land reclamation and ground improvement works of the foreshore for the future expansion of the Changi International airport and associated facilities. Reclamation works in the project involve...
Journal Articles
Proceedings of the Institution of Civil Engineers - Ground Improvement (2001) 5 (4): 141–153.
Published: 01 January 2001
...V. Choa; M. W. Bo; J. Chu Reclamation in Changi East, Singapore involved the formation of 2000 ha of land. The use of prefabricated vertical drains, combined with surcharge, was required to accelerate the consolidation settlement of the underlying soft compressible soil throughout most of the area...
