Fast-track construction projects that begin with inadequate design information have become more common in response to a rising construction industry demand. Fast-tracking shortens project duration while increasing rework. To meet project deadlines while minimising rework, specialists must select the best fast-tracking strategy. As a result, a questionnaire was developed to assess the success characteristics of fast-track construction and to provide constraints for these features and variables in national construction projects. National construction projects address specific government needs or investments to maximise the national return. The survey limited these factors by specifying maximum and minimum percentages. These percentages were chosen to expedite project building. The period in national projects varies from that of the typical construction approach to the shortest time that can be achieved with a plan. Cost and quality are within 20 and 10% of those of national project traditional construction methods, respectively. The best setting for various construction projects is determined by these proportions. It is preferable to use these percentages as a reference to complete construction projects within the shortest time, with the highest quality and at the lowest cost. This questionnaire was completed by 211 building experts.
Article navigation
16 June 2023
Research Article|
April 28 2023
Controlling fast-track construction method variables (time, cost and quality) Available to Purchase
Mohamed Ehab El-Far, MSc;
Al-Azhar University, Cairo, Egypt
(corresponding author: mohamedehab18@hotmail.com)
Search for other works by this author on:
Mostafa Kotb, PhD;
Mostafa Kotb, PhD
Professor
Civil Department, Al-Azhar University, Cairo, Egypt
Search for other works by this author on:
Reda Sabry, PhD
Reda Sabry, PhD
Lecturer
American University in Cairo, Cairo, Egypt
Search for other works by this author on:
(corresponding author: mohamedehab18@hotmail.com)
Publisher: Emerald Publishing
Accepted:
April 25 2023
Received:
June 02 2023
Online ISSN: 2053-0250
Print ISSN: 2053-0242
ICE Publishing: All rights reserved
2023
Infrastructure Asset Management (2023) 10 (2): 103–112.
Article history
Accepted:
April 25 2023
Received:
June 02 2023
Citation
El-Far ME, Kotb M, Sabry R (2023), "Controlling fast-track construction method variables (time, cost and quality)". Infrastructure Asset Management, Vol. 10 No. 2 pp. 103–112, doi: https://doi.org/10.1680/jinam.23.00001
Download citation file:
Suggested Reading
Evaluating the effect of the accelerated construction method on project life-cycle cost
Infrastructure Asset Management (July,2023)
What is the Iron Triangle, and how has it changed?
International Journal of Managing Projects in Business (April,2018)
Applicability of drywall technologies for disaster-induced housing reconstruction
International Journal of Disaster Resilience in the Built Environment (July,2021)
Effects of overtime work and additional resources on project cost and quality
Engineering, Construction and Architectural Management (March,2000)
A grey mathematical model for crashing of projects by considering time, cost, quality, risk and law of diminishing returns
Grey Systems: Theory and Application (May,2018)
Related Chapters
Are Operations Management Dimensions Necessary For Firm Performance?: A Necessary Condition Analysis
Amplifying Management Research for the Common Good: Lessons for Curious Individuals and Organizations—Insights From Practitioners in the Field
THE DESIGN AND CONSTRUCTION OF LARGE RCC DAMS
Application of Codes, Design and Regulations: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–7 July 2005
Construction Programmes and Programming: A Critical Review
10th Nordic Conference on Construction Economics and Organization
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.