Construction contributes to city development. In Egypt, many projects have been established using the accelerated construction method (ACM), and others using the traditional construction method (TCM). Their life-cycle cost (LCC) is analysed to determine the benefit–cost (BC) and determine the optimum construction method. In this paper, a comparative study between the LCCs of the ACM and TCM was carried out to improve decision making to make reasonable judgements on the economics of projects throughout their life cycle. The main question is, what is the optimum way of construction to reach the highest BC? The Mostafa El-Nahas axis in Cairo, Egypt, was studied using LCC analysis to determine the development BC by analysing the traffic impact before and after development. The cost of operating the project consists of elements including the fuel consumed in cars and the exhaust resulting from the combustion of this fuel. Amounts of money saved from operation cost by the ACM were expressed by the case study BC. The main findings were that government entities should develop guidelines establishing the maximum time for construction. According to a prior study, extending the construction time had no detrimental impact on public interest in these places. The LCC study of the project was used to estimate construction time. Guidelines should be established that specify the regions to be classified based on traffic and population and the maximum time for construction.
Article navigation
18 September 2023
Research Article|
July 06 2023
Evaluating the effect of the accelerated construction method on project life-cycle cost
Mohamed Ehab El-Far, MSc;
Civil Engineering Department, Faculty of Engineering, Al-Azhar University, Cairo, Egypt
(corresponding author: mohamedehab18@hotmail.com)
Search for other works by this author on:
Reda Abass Sabry, PhD;
Reda Abass Sabry, PhD
Civil Engineering Department, Faculty of Engineering, The American University, Cairo, Egypt
Search for other works by this author on:
Mostafa Kotb, PhD
Mostafa Kotb, PhD
Civil Engineering Department, Faculty of Engineering, Al-Azhar University, Cairo, Egypt
Search for other works by this author on:
(corresponding author: mohamedehab18@hotmail.com)
Publisher: Emerald Publishing
Received:
April 25 2023
Accepted:
July 04 2023
Online ISSN: 2053-0250
Print ISSN: 2053-0242
Emerald Publishing Limited: All rights reserved
2023
Infrastructure Asset Management (2023) 10 (3): 126–143.
Article history
Received:
April 25 2023
Accepted:
July 04 2023
Citation
El-Far ME, Sabry RA, Kotb M (2023), "Evaluating the effect of the accelerated construction method on project life-cycle cost". Infrastructure Asset Management, Vol. 10 No. 3 pp. 126–143, doi: https://doi.org/10.1680/jinam.23.00021
Download citation file:
New and popular articles
Suggested Reading
Controlling fast-track construction method variables (time, cost and quality)
Infrastructure Asset Management (April,2023)
Application framework for safety-centric construction acceleration planning
Engineering, Construction and Architectural Management (January,2022)
Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana
Journal of Engineering, Design and Technology (April,2017)
A grey mathematical model for crashing of projects by considering time, cost, quality, risk and law of diminishing returns
Grey Systems: Theory and Application (May,2018)
What is the Iron Triangle, and how has it changed?
International Journal of Managing Projects in Business (April,2018)
Related Chapters
Venture Capital’s Role in Creating a More Sustainable Society: The Role of Exits in Clean Energy’s Investment Growth
Sustainability, Stakeholder Governance, and Corporate Social Responsibility
Adaptation and Return among Israeli Enclave and Infotech Entrepreneurs
Immigration and Work
ROLLER COMPACTED CONCRETE: A NEW WAY IN ALGERIAN DAM CONSTRUCTION
Role of Concrete In Sustainable Development: Proceedings of the International Symposium dedicated to Professor Surendra Shah, Northwestern University, USA held on 3–4 September 2003 at the University of Dundee, Scotland, UK
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.