Keywords: OPERATIONS
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Journal Articles
Journal of the Institution of Civil Engineers (1949) 31 (4): 331–350.
Published: 01 February 1949
... occupation of the line, two of the cables were cut, drawn forward, and lifted into their new position, and the gap was made good. MECHANICAL MEANS IN POLHILL TUNNEL. 339 340 CANTRELL ON RENEWAL OF BALLAST AND TRACK BY (6) The operation of stage 5 was repeated for the remaining three cables. (7)The new...
Journal Articles
Journal of the Institution of Civil Engineers (1939) 12 (8): 422–428.
Published: 01 October 1939
...A W H DEAN; G COVELL; H E FITZGIBBON; R RAM © Thomas Telford and ICE 1939 ANTI MALARIAL MALARIA OPERATIONS ANTI MALARIA CITIES URBAN AREAS COUNTRIES DEVELOPING DISEASES PUBLIC HEALTH CONTROL MEASURES EPIDEMICS RAINFALL SUBSOIL MOSQUITOES DRAINAGE DELHI INDIA...
Journal Articles
Journal of the Institution of Civil Engineers (1939) 11 (4): 157–164.
Published: 01 February 1939
... COUNTRIES DEVELOPING OPERATIONS ANTI MALARIA DELHI JUMNA INDIA ASIA DEAN ON ANTI-MATART~4L OPERATIONS TN DELHI TJRBAN AREA. 157 Paper No. 5190. Anti-Malarial Operations in the Delhi Urban Area. By ARTHUR WILLIAMHENRYDEAN,M.C., B.SC., M. INSTC..E. (Abridgcd).l (Ordewd by the Council...
Journal Articles
Journal of the Institution of Civil Engineers (1938) 9 (7): 95–123.
Published: 01 June 1938
...M R ATKINS; D H REMFRY INDIA ASIA © Thomas Telford and ICE 1938 GAMMON & SANDERSON BIRD HINDUSTAN ENGINEERING RECONSTRUCTION MAIN ROADS BRIDGES OPERATIONS ARCHES CANALS COSTS DESIGN LOADING WORKING STRESS BOWSTRING REPLACEMENT REINFORCED CONCRETE PILING...
Journal Articles
Journal of the Institution of Civil Engineers (1938) 8 (6): 376–406.
Published: 01 April 1938
... : per cemnta.ximum. Load-factor, excluding peak-load and peak- plant : per cent. . . . . . . . Load-factor of peak-plant : per cent. . . Railway. 5562.1.5 71 12.2 Municipalcitlyid. . 60 72-6 73 5.5 7.8 It can be calculated from these figures that if the capital charges per kilowatt and operating costs...

or Create an Account

Close Modal
Close Modal