Purpose

The purpose of this paper is to present a new mathematical model for the unrelated parallel machine scheduling problem with aging effects and multi-maintenance activities.

Design/methodology/approach

The authors assume that each machine may be subject to several maintenance activities over the scheduling horizon and a machine turn into its initial condition after maintenance activity and the aging effects start anew. The objective is to minimize the weighted sum of early/tardy times of jobs and maintenance costs.

Findings

As this problem is proven to be non-deterministic polynomial-time hard (NP-hard), the authors employed imperialist competitive algorithm (ICA) and genetic algorithm (GA) as solution approaches, and the parameters of the proposed algorithms are calibrated by a novel parameter tuning tool called Artificial Neural Network (ANN). The computational results clarify that GA performs better than ICA in quality of solutions and computational time.

Originality/value

Predictive maintenance (PM) activities carry out the operations on machines and tools before the breakdown takes place and it helps to prevent failures before they happen.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close subscription notice
Close access options