Open figure viewer
A knowledge of the thermal conductivity of concrete during the early hydration period (7 days) is essential to obtain an accurate estimate of the thermal stresses that will develop in a concrete structure as a result of the heat produced by the binder during hydration. This paper describes a probe that is capable of measuring the thermal conductivity of a 2 kg concrete or mortar sample during all stages of hydration. A method of calculating the thermal conductivity of concrete with large aggregates from the measured conductivity of the mortar and the conductivity of the aggregates is also discussed.
Keywords:
concrete
This content is only available via PDF.
© 1998 Thomas Telford Ltd
1998
You do not currently have access to this content.
