This paper presents the results of laboratory and field investigations of bridge beams repaired both under propped and unpropped conditions. In the laboratory, beams were repaired using hand-applied repairs. Repairs to beams in two highway bridges were carried out using both hand-applied and flowing repairs. The repair materials used were commercial products of wide-ranging properties (shrinkage, creep and elastic modulus). Both low stiffness repair materials of elastic modulus, Erm, less than the substrate Esub, and high stiffness repair materials (Erm > Esub) were used. The repairs were applied in the tensile zone of the beams. Strain distributions in the different phases of repair patches were monitored under service loading for a period of up to 240 weeks. The results show that high structural efficiency is achieved with repairs having Erm > Esub, other properties (shrinkage and creep) being within reasonable limits. Such repairs are less prone to restrained shrinkage cracking and show a capacity for load redistribution into the repair patch. Low stiffness repairs (Erm < Esub), on the other hand, are prone to restrained shrinkage cracking and are ineffective in load-sharing with the substrate. Repairs to propped flexural members developed erratic and non-uniform load distribution in the different phases upon reapplication of load. Composite action between the repair patch and the substrate results in cracking in the repair patch, rendering the repairs structurally inefficient.
Article navigation
August 2000
Research Article|
August 01 2000
Factors affecting the efficiency of repair to propped and unpropped bridge beams
P. S. Mangat;
P. S. Mangat
*
Sheffield Hallam University, School of Environment and Development
City Campus, Pond Street, Sheffield S1 1WB, UK.
Search for other works by this author on:
F. J. O'Flaherty
F. J. O'Flaherty
*
Sheffield Hallam University, School of Environment and Development
City Campus, Pond Street, Sheffield S1 1WB, UK.
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
July 28 1999
Revision Received:
February 22 2000
Accepted:
April 13 2000
Online ISSN: 1751-763X
Print ISSN: 0024-9831
© 2000 Thomas Telford Ltd
2000
Magazine of Concrete Research (2000) 52 (4): 303–319.
Article history
Received:
July 28 1999
Revision Received:
February 22 2000
Accepted:
April 13 2000
Citation
Mangat PS, O'Flaherty FJ (2000), "Factors affecting the efficiency of repair to propped and unpropped bridge beams". Magazine of Concrete Research, Vol. 52 No. 4 pp. 303–319, doi: https://doi.org/10.1680/macr.2000.52.4.303
Download citation file:
New and popular articles
Suggested Reading
Editorial
Structural Concrete (September,2007)
2007 reviewers
Structural Concrete (December,2007)
Editorial
Structural Concrete (December,2009)
Editorial
Structural Concrete (March,2007)
Author index
Structural Concrete (December,2003)
Related Chapters
THE CONDITIONS OF THAUMASITE FORMATION AND ITS ROLE IN CONCRETE
Challenges of Concrete Construction: Volume 6, Concrete for Extreme Conditions: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
ASSESSMENT OF FIRE DAMAGE OF CONCRETE BY USING INFRARED THERMAL IMAGING METHOD
Challenges of Concrete Construction: Volume 6, Concrete for Extreme Conditions: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
A new assessment model for shear in reinforced concrete bridges with short anchorage lengths
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.