The port of Gijón is Spain's leading dry bulk-cargo port with annual traffic in excess of 21·5 Mt. Its main unloading terminal - designed for an annual traffic of 12 Mt - is at present unloading more than 16 Mt, with rates of occupation that are greater than advisable and limits on vessel draughts. This paper reports on the current port extension project, which involves building a new breakwater with a total length of 3834 m and creating a basin of 145 ha sheltered water. This will enable three 230 000 t deadweight bulk carriers with a draught of 20 m to berth simultaneously. It will also provide the port with a new solid bulk terminal that has an unloading capacity of over 25 Mt and a storage area of 60 ha, which will enable up to 2 Mt of iron ore and coal to be stocked. The €580 million, part-EU-funded project is due for completion by 2010.
Article navigation
December 2008
Research Article|
December 01 2008
Extension to the port of Gijón, Spain
J. L. Díaz Rato;
J. L. Díaz Rato
General Director
Gijón Port Authority
Spain
Search for other works by this author on:
J. Moyano Retamero;
J. Moyano Retamero
Head of Projects & Works Department
Gijón Port Authority
Spain
Search for other works by this author on:
M. de Miguel Riestra
M. de Miguel Riestra
Head of Projects & Works Division
Gijón Port Authority
Spain
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
April 07 2008
Accepted:
August 22 2008
Online ISSN: 1751-7737
Print ISSN: 1741-7597
© 2008 Thomas Telford Ltd
2008
Maritime Engineering (2008) 161 (4): 153–174.
Article history
Received:
April 07 2008
Accepted:
August 22 2008
Citation
Díaz Rato JL, Moyano Retamero J, Miguel Riestra MD (2008), "Extension to the port of Gijón, Spain". Maritime Engineering, Vol. 161 No. 4 pp. 153–174, doi: https://doi.org/10.1680/maen.2008.161.4.153
Download citation file:
New and popular articles
Suggested Reading
Initial motion of streambeds composed of coarse uniform sediments
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (December,2000)
Minimising dredging for seawall construction in Hong Kong
Maritime Engineering (September,2004)
Briefing: Dunwich coastal protection demonstration project
Maritime Engineering (December,2010)
Neural network architectures and overtopping predictions
Maritime Engineering (September,2005)
Briefing: Microscopic study into biodeterioration of joint sealant
Proceedings of the Institution of Civil Engineers - Construction Materials (February,2013)
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
