Contingency sums are vital to any project’s cost budgeting, estimation and management of risk events. This study investigates the methods used by clients to determine contingency sums in project budgets and the key factors influencing the selection of a methodology for setting contingency. Questionnaire survey data collected from 53 respondents in client organisations were analysed using descriptive statistics. The findings show that there are two prevailing methods used by clients for setting project contingency sums in the Middle East, namely deterministic bottom-line percentage norms and quantitative statistical risk analysis (Monte Carlo simulation). These two methods, which were mostly used in oil and gas, energy and mining projects tend to be very process-driven and control-oriented due to the complexity and severity of risks associated with projects in these sectors. The primary factor influencing client selection of a contingency setting methodology was familiarity with the approach, followed by simplicity, accuracy, time availability and organisational mandate structure. This was the main reason the bottom-line percentage method approach is more widely used in practice, although the respondents recommended the statistical risk analysis approach over percentage norms as this provides a more tailored scientific approach that considers a project’s bespoke risk profile.
Article navigation
1 October 2025
Research Article|
March 14 2025
Methods used by clients to determine contingency sums for construction projects in the Middle East
Lee Morton-Shepherd;
Lee Morton-Shepherd
School of Construction Economics and Management,
University of the Witwatersrand
, Johannesburg, South Africa
Search for other works by this author on:
Samuel Laryea
;
Samuel Laryea
School of Construction Economics and Management,
University of the Witwatersrand
, Johannesburg, South Africa
Search for other works by this author on:
Zamageda Zungu;
Zamageda Zungu
School of Construction Economics and Management,
University of the Witwatersrand
, Johannesburg, South Africa
Search for other works by this author on:
Oscar Kwame Kwasafo
School of Construction Economics and Management,
University of the Witwatersrand
, Johannesburg, South Africa
Corresponding author Oscar Kwame Kwasafo (okkwasafo@gmail.com)
Search for other works by this author on:
Corresponding author Oscar Kwame Kwasafo (okkwasafo@gmail.com)
Publisher: Emerald Publishing
Received:
November 01 2024
Accepted:
December 09 2024
Online ISSN: 1751-4312
Print ISSN: 1751-4304
© 2025 Emerald Publishing Limited
2025
Emerald Publishing Limited
Licensed re-use rights only
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (2025) 178 (4): 221–230.
Article history
Received:
November 01 2024
Accepted:
December 09 2024
Citation
Morton-Shepherd L, Laryea S, Zungu Z, Kwasafo OK (2025), "Methods used by clients to determine contingency sums for construction projects in the Middle East". Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, Vol. 178 No. 4 pp. 221–230, doi: https://doi.org/10.1680/jmapl.24.00083
Download citation file:
New and popular articles
Suggested Reading
Influence of project alliance in rail construction industry
Proceedings of the Institution of Civil Engineers - Municipal Engineer (February,2021)
Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (January,2018)
Comparison of two infrastructure project implementation models in a developing country
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (February,2018)
Innovative construction procurement at Wits University
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (October,2014)
Creating strategic alignment during the development of procurement instruments
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (August,2020)
Related Chapters
The Client's Perspective
Early Contractor Involvement: Improving the Management of Contract Risk
The Project Manager's Perspective
Early Contractor Involvement: Improving the Management of Contract Risk
The client role in masterplanning
Rethinking Masterplanning: Creating Quality Places
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.