Integrated management systems (IMS) are an innovative method of handling the multitude of management functions and procedures that are applied throughout major construction projects. Quality, safety and environment are at the forefront of management systems evolution where the integration of these traditionally independent and dedicated organisational systems is expected to deliver a range of benefits through efficiency gains and operational effectiveness at both the company and project level. Building and civil engineering contracting organisations are implementing management integration in different ways and this makes the potential benefits of successful systems application difficult to identify and share widely throughout the industry. This paper reports on a government-funded PhD project that examined IMS developments in the construction industry. The research involved data obtained from a survey of 30 UK-based building and civil engineering companies together with interviews and case studies provided by five principal contractors at the leading-edge of management systems integration. The research found that IMS has the potential to deliver greater organisational effectiveness and efficiency and can improve project performance. It also identified that difficulties in system configuration and implementation are commonplace. The challenge is to establish a generic framework for IMS development which contractors can apply to their activities within the context of their core business.
Article navigation
August 2008
Research Article|
August 01 2008
Contractors’ experiences of integrated management systems Available to Purchase
A. Griffith, MSc, PhD, DSc;
A. Griffith, MSc, PhD, DSc
Professor of Construction Management
Sheffield Hallam University
UK
Search for other works by this author on:
K. Bhutto, MSc, PhD
K. Bhutto, MSc, PhD
Director
Safe Scope Ltd
Ipswich, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
September 26 2008
Accepted:
September 26 2008
Online ISSN: 1751-4312
Print ISSN: 1751-4304
© 2008 Thomas Telford Ltd
2008
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (2008) 161 (3): 93–98.
Article history
Received:
September 26 2008
Accepted:
September 26 2008
Citation
Griffith A, Bhutto K (2008), "Contractors’ experiences of integrated management systems". Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, Vol. 161 No. 3 pp. 93–98, doi: https://doi.org/10.1680/mpal.2008.161.3.93
Download citation file:
Suggested Reading
Achieving sustainability in vibro stone column techniques
Proceedings of the Institution of Civil Engineers - Engineering Sustainability (December,2005)
Corporate governance of road construction in Brunei Darussalam
Proceedings of the Institution of Civil Engineers - Transport (August,2002)
Six Sigma – so what?
Assembly Automation (January,2006)
Quality street
Assembly Automation (January,2006)
Quality Control in Soft Contact Lens Manufacture — A Case Study
International Journal of Quality & Reliability Management (January,1988)
Related Chapters
APPLICATION OF QUALITY CONTROL CONCEPTS IN CONSTRUCTION ENGINEERING WORKS BY SUGGESTING ROOFING SYSTEM FOR BUILDING PROJECTS IN IRAQ
Application of Codes, Design and Regulations: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–7 July 2005
A QUALITY CONTROL SYSTEM FOR READY MIXED CONCRETE IN SAUDI ARABIA
Challenges of Concrete Construction: Volume 6, Concrete for Extreme Conditions: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
The Supply Chain: Discourse on Black Male College Football Players and Revenue Generation
Black Males and Intercollegiate Athletics: An Exploration of Problems and Solutions
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
