The NEC Engineering and Construction Contract (ECC) is a popular choice for construction and design-and-build contracts in the UK and South Africa. They are also increasingly by being used elsewhere in the world, for example in New Zealand and in Hong Kong. The NEC family of contracts is specifically designed for international use. The NEC Term Service Contract (TSC) is also increasingly being used for contracts to provide a service including, often, the operation and maintenance of an asset. Some clients are increasingly looking to appoint a contractor to design, build and operate an asset and so take a real interest in the operability and operating cost of the asset. This paper looks at key issues specific to design, build and operate contracts and explains how the NEC ECC and NEC TSC could be combined to form the basis of a design, build and operate contract. It is true that changes would be required, but with an NEC base to the contract, all parties would have the benefit of starting from what have become industry standard forms of contract, namely forms that are designed for clarity, flexibility and, most importantly, as a stimulus to good management.
Article navigation
October 2013
Research Article|
October 01 2013
NEC contracts for design–build–operate contracts
Richard L. Patterson, MBA, CEng MICE;
Richard L. Patterson, MBA, CEng MICE
Mott McDonald Ltd,
Cambridge, UK
Search for other works by this author on:
Barry Trebes, BSc(Hons), MSc, FRICS, FAPM, FInstCES
Barry Trebes, BSc(Hons), MSc, FRICS, FAPM, FInstCES
Mott McDonald Ltd,
Cambridge, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
July 20 2012
Accepted:
September 19 2012
Online ISSN: 1751-4312
Print ISSN: 1751-4304
ICE Publishing: All rights reserved
2013
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (2013) 166 (5): 260–268.
Article history
Received:
July 20 2012
Accepted:
September 19 2012
Citation
Patterson RL, Trebes B (2013), "NEC contracts for design–build–operate contracts". Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, Vol. 166 No. 5 pp. 260–268, doi: https://doi.org/10.1680/mpal.12.00020
Download citation file:
Suggested Reading
Enhancing off-site manufacturing through early contractor involvement (ECI) in New Zealand
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (January,2018)
Comparison of two infrastructure project implementation models in a developing country
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (February,2018)
Innovative construction procurement at Wits University
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (October,2014)
Creating strategic alignment during the development of procurement instruments
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (August,2020)
Outsource or in‐house facilities management: The pros and cons
Journal of Facilities Management (October,2003)
Related Chapters
Sourcing from Multinational Suppliers to Overcome Weak Contracting Institutions and Gain Supply Chain Capabilities
Geography, Location, and Strategy
Functional-Level Transformation in Multi-Domestic MNCs: Transforming Local Purchasing into Globally Integrated Purchasing
Orchestration of the Global Network Organization
Updating and Cleaning Out: The “Make or Buy” Decision in Construction Revisited
10th Nordic Conference on Construction Economics and Organization
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.