Building information modelling (BIM) is acknowledged globally as a key computer-aided technology that expedites construction productivity enhancements. Consequently, the utilisation of BIM has been gaining precedence in Singapore’s construction industry during the past few years, aiding enhanced project management. Productivity improvement has been a concern for the construction industry in Singapore in the last decade, and the method of measuring productivity improvement is one of the major issues. This study adopts a quantitative research and development approach to determine the impact of BIM on the productivity of Singapore’s precast industry. On the basis of the observations of the authors on the workflows followed by three precast firms in Singapore, this study aims to propose and apply a fuzzy mapping technique to measure productivity improvement; furthermore, it also identifies the constrictions in the present workflow and proposed an improved workflow to address the prevalent constraints to facilitate the transition of the precast firms towards enhanced productivity. In this paper, the productivity gains obtained through the change in the workflow for specific activities were identified and recorded, and the critical activities deviating towards a lower percentage in terms of productivity were deemed essential to be diligently taken into account by the precast firms.
Article navigation
1 October 2016
Research Article|
May 23 2016
Precast workflow productivity measurement through BIM adoption
Tushar Nath, MSc;
School of Civil and Environmental Engineering, Nanyang Technological University, Singapore
(corresponding author: tnath@ntu.edu.sg; nathtushar@hotmail.com)
Search for other works by this author on:
Meghdad Attarzadeh, PhD;
Meghdad Attarzadeh, PhD
Research Fellow
School of Civil and Environmental Engineering, Nanyang Technological University, Singapore
Search for other works by this author on:
Robert L. K. Tiong, PhD
Robert L. K. Tiong, PhD
Associate Professor
School of Civil and Environmental Engineering, Nanyang Technological University, Singapore
Search for other works by this author on:
(corresponding author: tnath@ntu.edu.sg; nathtushar@hotmail.com)
Publisher: Emerald Publishing
Received:
September 08 2015
Accepted:
April 08 2016
Online ISSN: 1751-4312
Print ISSN: 1751-4304
ICE Publishing: All rights reserved
2016
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (2016) 169 (5): 208–216.
Article history
Received:
September 08 2015
Accepted:
April 08 2016
Citation
Nath T, Attarzadeh M, Tiong RLK (2016), "Precast workflow productivity measurement through BIM adoption". Proceedings of the Institution of Civil Engineers - Management, Procurement and Law, Vol. 169 No. 5 pp. 208–216, doi: https://doi.org/10.1680/jmapl.15.00045
Download citation file:
New and popular articles
Suggested Reading
Crossrail project: building a virtual version of London’s Elizabeth line
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2017)
Design and construction of the new library at China Agricultural University
Proceedings of the Institution of Civil Engineers - Civil Engineering (December,2018)
Building information modelling roadmap strategy for Turkish construction sector
Proceedings of the Institution of Civil Engineers - Municipal Engineer (July,2018)
Using building information modelling for a commercial building in Beijing, China
Proceedings of the Institution of Civil Engineers - Civil Engineering (January,2019)
Smarter construction site management using the latest information technology.
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2018)
Related Chapters
Programme management contracts formation
Programme Management in Construction
Managing BIM
BIM in Principle and in Practice
Building information modelling (BIM)
Civil Engineering Procedure
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.