You do not currently have access to this content.
Article navigation
Research Article|
January 01 1900
ON METHODS ADOPTED IN CARRYING OUT DOCK AND HARBOUR WORKS AT QUEBEC, WITH DESCRITPION OF THE PLANT EMPLOYED.(INCLUDING APPENDIX AND PLATE AT BACK OF VOLUME).
Publisher: Emerald Publishing
Online ISSN: 2054-0477
Print ISSN: 1753-7843
© Thomas Telford and ICE
1900
Minutes of the Proceedings of the Institution of Civil Engineers (1900) 139 (1900): 286–292.
Citation
PILKINGTON W (1900), "ON METHODS ADOPTED IN CARRYING OUT DOCK AND HARBOUR WORKS AT QUEBEC, WITH DESCRITPION OF THE PLANT EMPLOYED.(INCLUDING APPENDIX AND PLATE AT BACK OF VOLUME).". Minutes of the Proceedings of the Institution of Civil Engineers, Vol. 139 No. 1900 pp. 286–292, doi: https://doi.org/10.1680/imotp.1900.18630
Download citation file:
New and popular articles
Suggested Reading
INFORMAL DISCUSSION. DESIGN FOR OBSOLESCENCE IN MARITIME WORKS.
Proceedings of the Institution of Civil Engineers (July,1965)
THE VERNON-HARCOURT LECTURE, 1939-40. THE CONSTRUCTION OF DEEP-WATER QUAYS. (INCLUDES PLATES).
Journal of the Institution of Civil Engineers (April,1940)
DREDGING AND OTHER PLANT EMPLOYED AT THE QUEBEC HARBOUR WORKS. (INCLUDES PLATE).
Minutes of the Proceedings of the Institution of Civil Engineers (January,1881)
WICKLOW HARBOUR IMPROVEMENTS. (INCLUDES PLATE).
Minutes of the Proceedings of the Institution of Civil Engineers (January,1887)
CRIBWORK IN CANADA. (INCLUDES PLATE).
Minutes of the Proceedings of the Institution of Civil Engineers (January,1881)
Related Chapters
Lime and cement stabilisation
Temporary Works: Principles of Design and Construction
Tower crane bases
Temporary Works: Principles of design and construction
Lime and cement stabilisation
Temporary Works: Principles of design and construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
