You do not currently have access to this content.
Article navigation
Research Article|
January 01 1860
ON THE PROCESS OF RAISING AND HANGING THE BELLS, IN THE CLOCK TOWER AT THE NEW PALACE, WESTMINSTER (INCLUDING APPENDIX AND PLATE.)
Publisher: Emerald Publishing
Online ISSN: 2054-0477
Print ISSN: 1753-7843
© Thomas Telford and ICE
1860
Minutes of the Proceedings of the Institution of Civil Engineers (1860) 19 (1860): 3–12.
Citation
JAMES J (1860), "ON THE PROCESS OF RAISING AND HANGING THE BELLS, IN THE CLOCK TOWER AT THE NEW PALACE, WESTMINSTER (INCLUDING APPENDIX AND PLATE.)". Minutes of the Proceedings of the Institution of Civil Engineers, Vol. 19 No. 1860 pp. 3–12, doi: https://doi.org/10.1680/imotp.1860.23603
Download citation file:
New and popular articles
Suggested Reading
DISCUSSION. ON THE PROCESS OF RAISING AND HANGING THE BELLS IN THE CLOCK TOWER AT THE NEW PALACE, WESTMINSTER.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1860)
THE CANAL LIFTS ON THE GRAND WESTERN CANAL. (INCLUDES DISCUSSION).
Minutes of the Proceedings of the Institution of Civil Engineers (January,1838)
DISCUSSION. CHAIN CABLE AND TIMBER TESTING MACHINES.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1857)
RESTORATION OF CRACKED BELLS BY TIN SOLDERING.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1860)
DISCUSSION ON PUMPS FOR LOW LIFTS; ARCHIMEDEAN SCREW FOR LIFTING WATER; CENTRIFUGAL PUMPS.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1871)
Related Chapters
Earthworks specifications
Earthworks: a guide
UK Specification for Ground Investigation
UK Specification for Ground Investigation
Specifications and associated controls
Polymer Support Fluids in Civil Engineering
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
