Article navigation
Discussion|
January 01 1933
CORRESPONDENCE. THE PRESENT POSITION OF THE PRESSURE-CHARGED HEAVY OIL MACHINE.
Publisher: Emerald Publishing
Online ISSN: 2054-0477
Print ISSN: 1753-7843
© Thomas Telford and ICE
1933
Minutes of the Proceedings of the Institution of Civil Engineers (1933) 235 (1933): 160–168.
Citation
DALBY WE, BRADBURY CH, BUCHI AJ, LUGT GJ, WANS O, MOORE JT (1933), "CORRESPONDENCE. THE PRESENT POSITION OF THE PRESSURE-CHARGED HEAVY OIL MACHINE.". Minutes of the Proceedings of the Institution of Civil Engineers, Vol. 235 No. 1933 pp. 160–168, doi: https://doi.org/10.1680/imotp.1933.13334
Download citation file:
New and popular articles
Suggested Reading
DISCUSSION. THE PRESENT POSITION OF THE PRESSURE-CHARGED HEAVY OIL MACHINE.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1933)
THE PRESENT POSITION OF THE PRESSURE-CHARGED HEAVY-OIL ENGINE.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1933)
CORRESPONDENCE. COMBUSTION-EFFICIENCIES OF GAS AND OIL ENGINES.
Journal of the Institution of Civil Engineers (October,1938)
DISCUSSION. DESCRIPTION OF THE WATER-PRESSURE ENGINE AT FREYBERG, SAXONY.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1843)
DISCUSSION. STIRLING'S IMPROVED AIR ENGINE.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1845)
Related Chapters
Asphalt production plants
The Shell Bitumen Handbook, 6th edition
Tower crane bases
Temporary Works: Principles of design and construction
Lime and cement stabilisation
Temporary Works: Principles of design and construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
