Article navigation
Discussion|
January 01 1845
DISCUSSION. THE FAILURE OF THE SUSPENSION BRIDGE AT GREAT YARMOUTH.
Publisher: Emerald Publishing
Online ISSN: 2054-0477
Print ISSN: 1753-7843
© Thomas Telford and ICE
1845
Minutes of the Proceedings of the Institution of Civil Engineers (1845) 4 (1845): 293–302.
Citation
RENDEL JM, PHIPPS GH, LESLIE J, NEWTON C, MILLS G, FIELD J, GRISSELL T, WALKER J (1845), "DISCUSSION. THE FAILURE OF THE SUSPENSION BRIDGE AT GREAT YARMOUTH.". Minutes of the Proceedings of the Institution of Civil Engineers, Vol. 4 No. 1845 pp. 293–302, doi: https://doi.org/10.1680/imotp.1845.24457
Download citation file:
New and popular articles
Suggested Reading
AN ACCOUNT OF THE FAILURE OF THE SUSPENSION BRIGDE AT GREAT YARMOUTH.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1845)
DISCUSSION. DESCRIPTION OF A METHOD OF ROLLING BARS FOR SUSPENSION BRIDGES AND OTHER SIMILAR PURPOSES.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1849)
AN ACCOUNT OF A PROPOSED SUSPENSION BRIDGE OVER THE HASLAR LAKE AT PORTSMOUTH.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1840)
ON THE USE OF THE SUSPENSION BRIDGE WITH STIFFENED ROADWAY FOR RAILWAY AND OTHER BRIDGES OF GREAT SPAN.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1867)
DESCRIPTION OF A METHOD OF ROLLING BARS FOR SUSPENSION BRIDGES AND OTHER SIMILAR PURPOSES. (ABSTRACT).
Minutes of the Proceedings of the Institution of Civil Engineers (January,1849)
Related Chapters
Case studies
Railway Bridge Maintenance
Lord Hill’s Bridge Mitigation Works
Crossrail Project: Infrastructure Design and Construction
STUs for new and existing railway bridges
Shock Transmission Units in Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
