You do not currently have access to this content.
Article navigation
Research Article|
January 01 1877
THE DESIGN AND CONSTRUCTION OF THE SOUTH RESERVE PIERS AND FLOATING LANDING STAGE AT BIRKENHEAD (INCLUDING PLATE AT BACK OF VOLUME) Available to Purchase
Publisher: Emerald Publishing
Online ISSN: 2054-0477
Print ISSN: 1753-7843
© Thomas Telford and ICE
1877
Minutes of the Proceedings of the Institution of Civil Engineers (1877) 50 (1877): 164–171.
Citation
SMITH CG (1877), "THE DESIGN AND CONSTRUCTION OF THE SOUTH RESERVE PIERS AND FLOATING LANDING STAGE AT BIRKENHEAD (INCLUDING PLATE AT BACK OF VOLUME) ". Minutes of the Proceedings of the Institution of Civil Engineers, Vol. 50 No. 1877 pp. 164–171, doi: https://doi.org/10.1680/imotp.1877.22327
Download citation file:
Suggested Reading
DESCRIPTION OF THE NEW FERRY AND THE NEW BRIGHTON PIERS AND LANDING STAGES ON THE RIVER MERSEY, NEAR LIVERPOOL.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1869)
DISCUSSION. DESCRIPTION OF THE LANDORE VIADUCT ON THE LINE OF THE SOUTH WALES RAILWAY.
Minutes of the Proceedings of the Institution of Civil Engineers (January,1855)
THE EGREMONT FERRY LANDING (INCLUDES PLATE).
Minutes of the Proceedings of the Institution of Civil Engineers (January,1878)
DESCRIPTION OF A WROUGHT-IRON PIER AT CLEVEDON, SOMERSET. (INCLUDES PLATE).
Minutes of the Proceedings of the Institution of Civil Engineers (January,1871)
INFORMAL DISCUSSION. PILING FOR BRIDGEWORKS.
Proceedings of the Institution of Civil Engineers (August,1973)
Related Chapters
Lord Hill’s Bridge Mitigation Works
Crossrail Project: Infrastructure Design and Construction
Case studies
Railway Bridge Maintenance
FAST TRACK DESIGN AND CONSTRUCTION OF CONCRETE BRIDGES
Concrete for Transportation Infrastructure: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–7 July 2005
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
