Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-20 of 136
Keywords: ENTRANCES
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1935) 240 (1935): 258–319.
Published: 01 January 1935
..., an extension of the wet dock, and a floating passenger landing-stage ; and theWest India andMillwall docks improvements, comprising a new entrance-lock, three connecting passages, sheds and quay-equipment. These works formed part of the programme of extensions and improvements proposed bythelate Sir...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1932) 233 (1932): 324–360.
Published: 01 January 1932
...W C ASH © Thomas Telford and ICE 1932 PORTS EXTENSIONS DOCKS JETTIES COUNTRIES DEVELOPING RIVERS BERTHING FOUNDATIONS SHEDS DESIGN CONSTRUCTION PILES ENTRANCES GRAVING ALIGNMENT LAYOUT CAISSONS WALLS FLOORS QUAYS TRANSIT PUMPING PLANT DEVELOPMENT LOCKS WORKS...
Journal Articles
SIR C HINDLEY, H A REED, F E WENTWORTH SHEILDS, W T HALCROW, C W WALES, SIR F PALMER, W C ASH, J D PEARSON
Minutes of the Proceedings of the Institution of Civil Engineers (1932) 233 (1932): 376–397.
Published: 01 January 1932
...SIR C HINDLEY; H A REED; F E WENTWORTH SHEILDS; W T HALCROW; C W WALES; SIR F PALMER; W C ASH; J D PEARSON © Thomas Telford and ICE 1932 PORTS EXTENSIONS CONSTRUCTION SINKING MONOLITHS DOCKS MODIFICATION GRAVING QUAYS WALLS ENTRANCES LAYOUT ALIGNMENT BERTHING COSTS...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1931) 232 (1931): 48–65.
Published: 01 January 1931
..., a lock 60 feet wide and 400 feet long, a single 80-foot entrance leading direct from the tidal basin to the river, a graving-dock, and a railway connecting the new dock system to the existing Calcutta jetties. Plans and estimates were prepared and carefully examined, and work on the new dock1 was started...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1931) 231 (1931): 370–371.
Published: 01 January 1931
...E T WARD © Thomas Telford and ICE 1931 RIVERS DELTAS NAVIGABILITY FLOW CONTROL DIVERSION REGULATION BARS ENTRANCES LOWER DANUBE SULINA BLACK SEA EUROPE RUMANIA ROMANIA 570 WARD ON THE NAVIGABILI!I!Y OF r1linut.e.sof (Paper No. 4744.) The Navigability...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1930) 229 (1930): 82–95.
Published: 01 January 1930
....) H.M.Dockyard,Devonport : Widening of No. 5 Basin-Entrance. M.By GEORGESTEPHEJNACOB, Inst. C.E. THE Keyham extension to H.M. Dockyard, Devonport, which was completed in 1907, provided, among other works, the following accommodation :- (l)B closed basin, known as No. 5 basin, of 34 acres, with a uniform depth...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1930) 229 (1930): 126–136.
Published: 01 January 1930
...E BOX; G E HOWORTH; D D STANIER; G S JACOB; J MITCHELL © Thomas Telford and ICE 1930 RECONSTRUCTION DOCKS WIDENING DOCKYARDS BASINS ENTRANCES GRAVING GATES SINGLE LEAF SINGLE LEAF LEAVES LOCKS WALLS COFFERDAMS DRY FLAPS PUMPS BONDING WALLS SILT PILES SHEETPILING...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1930) 229 (1930): 114–126.
Published: 01 January 1930
...SIR L SAVILE; H A REED; C H SANDEMAN; A BINNS; N G GEDYE; G S JACOB; J MITCHELL © Thomas Telford and ICE 1930 DOCKYARDS WIDENING BASINS ENTRANCES DOCKS RECONSTRUCTION GRAVING GATES SINGLE LEAF SINGLE LEAF LEAVES CAISSONS DAMS COSTS DRY ALTERATIONS CONCRETE ACCIDENTS...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1930) 229 (1930): 97–113.
Published: 01 January 1930
...J MITCHELL © Thomas Telford and ICE 1930 J WATT SANDEMAN RECONSTRUCTION GRAVING DOCKS ENTRANCES GATES SINGLE LEAF SINGLE LEAF LEAVES SHIPS COFFERDAMS PILING QUAYS WALLS PILES EXCAVATING DRIVING CONCRETE PITCH CULVERTS FILL FILLING MILD STEEL RIBS PUMPING...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1930) 230 (1930): 280–312.
Published: 01 January 1930
...E T WARD © Thomas Telford and ICE 1930 COASTS NAVIGABILITY RIVERS DELTAS IMPROVEMENT WORKS CUTTINGS COASTLINES CONFIGURATION CHANGE MOUTHS ENTRANCES DREDGERS DREDGING SHIPS PIERS LOWER DANUBE SULINA BLACK SEA EUROPE ROMANIA RUMANIA 280 WARD...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1927) 223 (1927): 37–64.
Published: 01 January 1927
...T B HUNTER; A L BELL © Thomas Telford and ICE 1927 MESSRS EASTON GIBB & SON DOCKYARDS SITES GEOLOGY WORKS CONSTRUCTION DAMS GRAVING DOCKS ENTRANCES PUMPING STATIONS MONOLITHS FOUNDATIONS LOCKS SINKING DREDGING MATERIALS REINFORCED CONCRETE GRANITE CAISSONS...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1927) 223 (1927): 65–76.
Published: 01 January 1927
...A L ANDERSON; A GIBB; M F G WILSON; E MOIR; G E W CRUTTWELL; A BINNS; J F RAMSBOTHAM; O FABER © Thomas Telford and ICE 1927 DOCKYARDS BORING DREDGING MONOLITHS CONSTRUCTION EXCAVATIONS CAISSONS ENTRANCES CONCRETE SCOTLAND ROSYTH DOVER UK Proceedings.] DISCUSSION...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1927) 223 (1927): 77–96.
Published: 01 January 1927
... occurring during thc progress of the work. A notableinstance of this was a t thesouth-eastern corner of the lock-entrance where the clay had been found to be of such a soft nature and overlaying such treacherous beds of silt that it wouldhavebeenexpensive and unwisc to constructthe caisson-camber...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1926) 221 (1926): 268–270.
Published: 01 January 1926
...W T HALCROW; M F G WILSON © Thomas Telford and ICE 1926 CONSTRUCTION ENTRANCES DOCKS BLOCKS COFFERDAMS BLOCKWORK DAMS CONCRETE TRANMERE DOCK BIRKENHEAD RIVER MERSEY UK 268 CORRESPONDEONNCE TRANYEEE DOCK. [Minutes of The Buthor. checked with templates and straight...
Journal Articles
L H SAVILE, G E W CRUTTWELL, H A REED, F M G DU PLAT TAYLOR, G VARLEY, H J DEANE, B HOWORTH, J MITCHELL
Minutes of the Proceedings of the Institution of Civil Engineers (1926) 221 (1926): 254–268.
Published: 01 January 1926
...L H SAVILE; G E W CRUTTWELL; H A REED; F M G DU PLAT TAYLOR; G VARLEY; H J DEANE; B HOWORTH; J MITCHELL © Thomas Telford and ICE 1926 MESSRS TOPHAN JONES & RAILTON (CARDIFF) CONSTRUCTION ENTRANCES DOCKS ANGLES TIDES CAISSONS FOUNDATIONS WIDTH DAMS ROCKS BLOCKS...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1926) 221 (1926): 241–253.
Published: 01 January 1926
...P W BERTLIN © Thomas Telford and ICE 1926 MESSRS CAMMELL, LAIRD & CO. LTD. MESSRS SIR JOHN WOLFE BARRY, LYSTER & PT CONSTRUCTION DOCKS ENTRANCES SLIPWAYS DESIGN COFFERDAMS FOUNDATIONS CONCRETE DAMS EXCAVATIONS RIVERS WALLS CAISSONS REMOVAL SLUICES...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1923) 216 (1923): 408–420.
Published: 01 January 1923
... in the design of the entrance lock m d the dry dock.Keepingthesills of the ent'rance all at one level,although it added tto the initial cost, was certainly a great advantage to the dock-maint.euance engineerover the usual practice of building the inner sill a t a higher level t.han t'lle outer sill, since...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1923) 216 (1923): 372–398.
Published: 01 January 1923
...A BINNS © Thomas Telford and ICE 1923 MESSRS. S. PEARSON & SON LTD SIR WILLIAM ARROL & CO. LTD DOCKS WORKS IMPROVEMENT DESIGN METHODS CONSTRUCTION LOCKS WET EXCAVATIONS DRY JETTIES RIVERS ENTRANCES TRANSIT SHEDS PUMPING STATIONS GATES FLOATING CAISSONS...
Journal Articles
A E CAREY, W D CAY, W A FOULIS, E W HOLLINGWORTH, C H SANDEMAN, J SANDERSON, F SPRING, D STEVENSON, C STEVENSON, G STEWART, A T WALMISLEY, MITCHELL, R F HINDMARSH, J W SANDEMAN, SIMPSON
Minutes of the Proceedings of the Institution of Civil Engineers (1920) 209 (1920): 227–250.
Published: 01 January 1920
...A E CAREY; W D CAY; W A FOULIS; E W HOLLINGWORTH; C H SANDEMAN; J SANDERSON; F SPRING; D STEVENSON; C STEVENSON; G STEWART; A T WALMISLEY; MITCHELL; R F HINDMARSH; J W SANDEMAN; SIMPSON © Thomas Telford and ICE 1920 IMPROVEMENT ENTRANCES HARBOURS REDUCTION WAVES ACTION HEIGHT...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1920) 209 (1920): 76–97.
Published: 01 January 1920
...W MATTHEWS; R BACON; E MOIR; E CRUTTWELL; A T WALMISLEY; C H COLSON; L H SAVILLE © Thomas Telford and ICE 1920 DOVER HARBOUR BOARD HARBOURS CONSTRUCTION WORKS PIERS VIADUCTS DREDGING EXTENSIONS RECLAMATION WAR WEATHER ENTRANCES CONCRETE BLOCKS REPAIRS DOVER...
