Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-20 of 74
Keywords: FLOATING
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1935) 240 (1935): 258–319.
Published: 01 January 1935
..., an extension of the wet dock, and a floating passenger landing-stage ; and theWest India andMillwall docks improvements, comprising a new entrance-lock, three connecting passages, sheds and quay-equipment. These works formed part of the programme of extensions and improvements proposed bythelate Sir...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1935) 240 (1935): 365–393.
Published: 01 January 1935
... no additional load on the structure in the way of plant, as a floating crane was used, which slung the pieces, weighing up to 5 tons, as they were severed from the bridge by oxy-acetylene burners. This method proved most effective, and the whole superstructure, weighing 1,750 tons, was taken down and disposed...
Journal Articles
R MAIR, SIR C HINDLEY, D ANDERSON, R D T ALEXANDER, J MACGLASHAN, FEREDAY, H J, A S BUCKLE, SIR G HEARN
Minutes of the Proceedings of the Institution of Civil Engineers (1933) 235 (1933): 90–104.
Published: 01 January 1933
...R MAIR; SIR C HINDLEY; D ANDERSON; R D T ALEXANDER; J MACGLASHAN; FEREDAY; H J; A S BUCKLE; SIR G HEARN © Thomas Telford and ICE 1933 BRIDGES RAILWAYS RIVERS PIERS FOUNDATIONS PRESSURE OPEN GRABBING SPANS TILTING WELLS SINKING CAISSONS ERECTION TESTING FLOATING OUT...
Journal Articles
C H HEATHCOTE, SIR H JAPP, N G GEDYE, E LATHAM, FM DU PLAT TAYLOR, B CUNNINGHAM, C P TAYLOR, G P MANNING, G T GARDNER, H J DEANE
Minutes of the Proceedings of the Institution of Civil Engineers (1932) 234 (1932): 328–342.
Published: 01 January 1932
... on what might be called gussets at the ends of the beams, without any diagonal bracing. If the Author could say how that bad been calculated, it would certainly be of interest. Mr. N. G. GEDYE remarked that he would be glad if the Author would amplifg. his description of the method by which tbe floating...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1930) 229 (1930): 97–113.
Published: 01 January 1930
... UNITS GREENHEART POSTS FLOATING TIMBER QUOINS HOLLOW DRY DEEPENING HEBBURN ON TYNE ENGLAND UK ENGLAND 96 MITCHELL ON RECONSTRUCTION OF GRAVING-DOCK [Minutes of (Paper No. 4714.) The Reconstruction of a Graving-Dock Entrancewith a Single-LeafGate at Hebburn-on-Tyne...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1930) 230 (1930): 40–71.
Published: 01 January 1930
... MONOLITHS WALLS PLANT PIPELINES DREDGERS SAND SPECIMENS MONSOONS DEFENCES COASTAL FLOATING BARS LAGOONS TROPICS ...
Journal Articles
E A CULLEN, P N FAWCETT, P W FRYER, A G MILNE, J MITCHELL, C J R WILLIAMS, E W PORTER, R F HINDMARSH, R C BRISTOW
Minutes of the Proceedings of the Institution of Civil Engineers (1930) 230 (1930): 86–98.
Published: 01 January 1930
...E A CULLEN; P N FAWCETT; P W FRYER; A G MILNE; J MITCHELL; C J R WILLIAMS; E W PORTER; R F HINDMARSH; R C BRISTOW © Thomas Telford and ICE 1930 HARBOURS WORKS FLOATING PIPELINES DREDGING SPOIL DISPOSAL WHARVES JETTIES CRANES CHANNELS JOINTS PUMPS STEEL SHEETPILING...
Journal Articles
H H BROUGHTON, W CLEAVER, L M COX, W T HALCROW, E LATHAM, J MITCHELL, G F NICHOLSON, M K RICE OXLEY, H E SQUIRE, C P TAYLOR
Minutes of the Proceedings of the Institution of Civil Engineers (1928) 226 (1928): 90–114.
Published: 01 January 1928
...-jet used, and therewas no doubt that the 4-inch jet-pipe in the core of the pile terminating in five nozzles was superior to the other types. The float,ing pile-driver used for driving all thelarge piles was a splendid tool, and the only criticism he had tooffer was that theoperator s cabin appearedto...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1928) 226 (1928): 4–18.
Published: 01 January 1928
...F C VOKES; C B TOWNEND © Thomas Telford and ICE 1928 BIRMINGHAM TAME & REA DISTR. DRAIN.BOARD POWER GAS SEWAGE SLUDGE WORKS TANKS SEDIMENTATION STEAM PUMPS SLUDGE DIGESTION SEPTIC PLANT COLLECTORS DESIGN FLOATING CONSTRUCTION GENERATING FINANCE GENERATION...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1925) 219 (1925): 211–231.
Published: 01 January 1925
...E H SALMON UK Proceedings.] SBLNON ON THE SOUTBAMPTOX FLOATING DOCK. 2 1 1 27 January, 1925. BASIL MOTTC, .B., President, in t,he Chair. The PRESIDENsTaid it was with very great regret that he had to announce the death of SirGuilford Molesworth,who was wellknown to all the members for his...
Journal Articles
A DENNY, M F G WILSON, F PALMER, S F STAPLES, C KIRKPATRICK, G E W CRUTTWELL, J M MONCRIEFF, L H SAVILE, A CLARKE, H J DEANE, N G GEDYE, SALMON, WENTWORTH SHEILDS
Minutes of the Proceedings of the Institution of Civil Engineers (1925) 219 (1925): 249–274.
Published: 01 January 1925
...A DENNY; M F G WILSON; F PALMER; S F STAPLES; C KIRKPATRICK; G E W CRUTTWELL; J M MONCRIEFF; L H SAVILE; A CLARKE; H J DEANE; N G GEDYE; SALMON; WENTWORTH SHEILDS © Thomas Telford and ICE 1925 FLOATING DOCKS WORKS CONSTRUCTION DOLPHINS DREDGING PAINTING MAINTENANCE MOORING...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1925) 219 (1925): 233–248.
Published: 01 January 1925
...F E WENTWORTH SHEILDS © Thomas Telford and ICE 1925 SOUTHERN RAILWAY COMPANY SOUTHAMPTON HARBOUR BOARD FLOATING DOCKS WORKS DREDGING DOLPHINS BRIDGES MOORING CABLES LOADS STRESS SOUTHAMPTON UK (Paper No. 4519.) Southampton Floating Dock : Subsidiary Works...
Journal Articles
E BOX, R C BRISTOW, TENNYSON EYNCOURT, F M DU PLAT TAYLOR, R F HINDMARSH, D J MUNRO, E H SALMON, F E WENTWORTH SHEILDS
Minutes of the Proceedings of the Institution of Civil Engineers (1925) 219 (1925): 275–282.
Published: 01 January 1925
...E BOX; R C BRISTOW; TENNYSON EYNCOURT; F M DU PLAT TAYLOR; R F HINDMARSH; D J MUNRO; E H SALMON; F E WENTWORTH SHEILDS © Thomas Telford and ICE 1925 DOCKS FLOATING WORKS DESIGN CONSTRUCTION PUMPING CONTROL MAINTENANCE COSTS STEAMERS SOUTHAMPTON KING GEORGE V LONDON...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1923) 216 (1923): 372–398.
Published: 01 January 1923
...A BINNS © Thomas Telford and ICE 1923 MESSRS. S. PEARSON & SON LTD SIR WILLIAM ARROL & CO. LTD DOCKS WORKS IMPROVEMENT DESIGN METHODS CONSTRUCTION LOCKS WET EXCAVATIONS DRY JETTIES RIVERS ENTRANCES TRANSIT SHEDS PUMPING STATIONS GATES FLOATING CAISSONS...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1920) 210 (1920): 383–393.
Published: 01 January 1920
...M W MEHAFFEY © Thomas Telford and ICE 1920 LIGHTHOUSES COASTS SEA SHIPS HAZARDS NAVIGATION REEFS LIGHTING TOWERS FOUNDATIONS CORAL CONSTRUCTION FLOATING PLANT QUEENSLAND AUSTRALIA Papers.] MEHAFPEY ON LIGHTIIOUSES IN QUIUNSLAND. 383 (Paper No. 4299.) ( New...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1914) 198 (1914): 104–151.
Published: 01 January 1914
... WALLS CONCRETE TRANSIT SHEDS FLOATING DOCKS CRANES SHIPBUILDING REPAIRS YARDS SHIPYARDS STORAGE HANDLING EXPORTS VENTILATION ELEVATORS POWER VIBRATIONS TESTS REINFORCED EXPERIMENTS ORGANISATION WEATHER NAVIGATION SEA OCEANS MONTREAL GREAT LAKES ST LAWRENCE CANADA...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1913) 192 (1913): 135–142.
Published: 01 January 1913
...W W HARTS; J HUSBAND; A H SHIELD; C E P SANKEY © Thomas Telford and ICE 1913 BRIDGES MILITARY CONDITIONS FLOATING PONTOONS PILES DRIVERS CRIBS CONNECTIONS CANTILEVER SUSPENSION TACKLE TRESTLES WAR Correspondence. Major W. W. HARTSof, Washington, consideredthat theAuthor...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1913) 193 (1913): 32–53.
Published: 01 January 1913
... of the entrance is now 600 feet, and themaximum tidal velocity about 18 months ago was 1 9 knot per hour, with float submerged 12 feet, and 1 758 knot with float submerged 20 feet.' The outer 370 feet was built entirely of concrete, the core being a weaker mixture (Fig. 3, Plate 2). Landward of this portion...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1913) 192 (1913): 77–126.
Published: 01 January 1913
...C E P SANKEY © Thomas Telford and ICE 1913 BRIDGES MILITARY CONSTRUCTION MATERIALS ANCHORAGES BEAMS GIRDERS CANTILEVER TRESTLES FRAMES SUSPENSION TENSION FLOATING PONTOONS BOATS BARRELS FERRIES LOADS CALCULATIONS TACKLE BRIDGING OPERATIONS DESIGN WAR BANKS...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1909) 177 (1909): 58–70.
Published: 01 January 1909
...M MOWAT © Thomas Telford and ICE 1909 MILLWALL DOCK COMPANY GRAIN HANDLING STORAGE APPLIANCES DOCKS MACHINERY ELEVATORS PIPES NOZZLES FLOATING SILOS GRANARIES CONVEYORS FLOORS CARGOES QUAYS MILLWALL ENGLAND LONDON UK 58 MOWAT ON SOME RECEXT GRAIN...
