Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: HEARTING
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
THE ISKANDAR BRIDGE, PERAK, FEDERATED MALAY STATES. (INCLUDES APPENDIX AND PLATE AT BACK OF VOLUME).
Minutes of the Proceedings of the Institution of Civil Engineers (1935) 240 (1935): 342–364.
Published: 01 January 1935
... of the work were as follows :- Propoxtion of cement to c0:bme aggregatc. Situation in work. 1:3 1 :33 1:6 1:6 Bottomplugstocaissonss,kewbacksandstringerseatings. Caisson-wallss,ealing-plugsandcaps, piers, precast blocks, abutment-parapets and wing-walls. Abutment-foundations. Hearting to caissons...
Journal Articles
J E HOLMSTROM, K J H EVANS, C D C BRAINE, T H WEBSTER, J S WILSON, SIR DALRYMPLE HAY, SIR H D HAY, L E HAWKINS, C I ROBINSON, F G COALES
Minutes of the Proceedings of the Institution of Civil Engineers (1935) 240 (1935): 394–404.
Published: 01 January 1935
... that thepoint which he wasabout tosuggest was sound, but he thought it was worthy of discussion. The hearting of the Authors wells had been done, he thought, with 640-1 con- crete. As that hearting was simply thereas a filler, the walls of the well being amply thick enough t o transmit all the loads...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1919) 207 (1919): 386–404.
Published: 01 January 1919
...D JAFFE © Thomas Telford and ICE 1919 WATERWORKS LOW LEVELS RESERVOIRS WORKS PUMPING SUPPLY WATER WATER SUPPLY COUNTRIES DEVELOPING DAMS FOUNDATIONS COFFERDAMS HEARTING MASONRY PUMPING STATIONS ROADS MAINS COSTS HONG KONG TAITAM TUK DAM HONG KONG ASIA...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1848) 7 (1848): 186–192.
Published: 01 January 1848
...W J M RANKINE © Thomas Telford and ICE 1848 SEA DEFENCES STORMS WALLS SEA WALLS COASTS BULWARKS CONSTRUCTION CONCRETE HEARTING MASONRY SANDSTONE STONE WAVES BREAKWATERS EDINBURGH SCOTLAND UK 186 SEA DEFEXCES. hard steel plates, is locked down, at the terminus...
