Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-5 of 5
Keywords: HIGH LEVEL
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1926) 221 (1926): 185–195.
Published: 01 January 1926
... pier was comparativelysimple to underpin. Hethoughtthat inallthe cases the designers had been fortunate infinding the hard" freestone ramble " on which t o terminate the piles, because they had actually had to depend entirely upon the end bearing resistance of the piles 188 DISCUSSION ON HIGH-LEVEL...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1926) 221 (1926): 196–200.
Published: 01 January 1926
...P L PRATLEY; J A SANER; W H THORPE; E G WALKER 196 CO1:HESPONDEXCE ON HIGH-LEVEL BRIDGE, [Minutes of Correspondence. D1r.Prat*e]; Mr. P. L. PRATLEreYmarked that the underpinning of the south pier constituted a very interesting piece of exploratory and repair work to an old structure. It struck him...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1926) 221 (1926): 173–184.
Published: 01 January 1926
...C F BENGOUGH © Thomas Telford and ICE 1926 NEWCASTLE & DARLINGTON JUNCTION RAILWAY MESSRS SIR WILLIAM ARROL & CO. BRIDGES UNDERPINNING REPAIRS FOUNDATIONS RIVERS PIERS STEEL COFFERDAMS INSPECTION CONCRETE COSTS HIGH LEVEL NEWCASTLE/TYNE UK Pm...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1906) 165 (1906): 231–237.
Published: 01 January 1906
...G W M BOYCOTT © Thomas Telford and ICE 1906 CAISSONS DISEASES HIGH LEVEL BRIDGES GASES COMPRESSION BENDS DECOMPRESSION NEWCASTLE-ON-TY ENGLAND BARMOUTH VIADUC RIVER TYNE UK Papers.] BOYCOTT ON CAISSON DISEASE. 231 (Paper No. 3609.) Caisson-Disease at the New High...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1900) 142 (1900): 253–271.
Published: 01 January 1900
...C F V JACKSON DESIGN CONSTRUCTION STEEL BRIDGES BRIDGEWORKS STEELWORK STRESS RAILWAYS HIGH LEVEL LOADS WHEELS ENGINES GIRDERS TRUSSES SHEAR CONCRETE ERECTION SPANS WIND BRACING RIVERS RIVETING QUEENSLAND BURDEKIN AUSTRALIA © Thomas Telford and ICE 1900...
