Keywords: LOCH LEVEN
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1912) 187 (1912): 28–73.
Published: 01 January 1912
...A H ROBERTS © Thomas Telford and ICE 1912 HYDROELECTRICITY WATER SUPPLY WATER SUPPLY POWER DOMESTIC CATCHMENTS RAINFALL DAMS CONSTRUCTION TRANSPORTATION MATERIALS CABLEWAYS CEMENT TOWERS CRACKS TOWERS VALUE CONDUITS PIPES LOCH LEVEN SCOTLAND BLACKWATER DAM...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1912) 187 (1912): 85–107.
Published: 01 January 1912
... RAINFALL EVAPORATION COSTS SCOTLAND LOCH LEVEN UK SOUTH AMERICA ARGENTINA Proceedings.] DISCUSSION ON LOCH LEVEN WATER-POWER WORKS. 85 Discussion. The PRESIDENiTn, moving a vote of thanks to the Authors, said TheResident. he was sure the members felt that theywere deeply indebted...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1912) 187 (1912): 107–141.
Published: 01 January 1912
... SUPPLY RAINFALL STORAGE DISCHARGES PIPES CRACKS CONDUITS RESERVOIRS EFFICIENCY MACHINERY LOCH LEVEN SCOTLAND UK Proceedings.] CORRESPONDENCE ON LOCH LEVEN WORKS. 107 charges and all works-costs would have been considerably increased, Mr. Sonnenbringing the total cost of a unit...

or Create an Account

Close Modal
Close Modal