Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-20 of 100
Keywords: RECONSTRUCTION
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1935) 239 (1935): 597–617.
Published: 01 January 1935
...A GRAY © Thomas Telford and ICE 1935 SIR ALEXANDER GIBB ATLAS CONSTRUCTION STANDARD DREDGING HARBOURS DEVELOPMENT CONSTRUCTION COFFERDAMS FAILURES RECONSTRUCTION UNWATERING DEWATERING EXCAVATIONS CONCRETE AGGREGATES TESTS REMOVAL TRANSIT SHEDS GRAIN CONVEYORS...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1934) 237 (1934): 108–118.
Published: 01 January 1934
...J D WATSON RECONSTRUCTION EMPRESS BRIDGE BRIDGES RIVERS RAILWAYS SPANS PIERS LOADS STAGING ERECTION GIRDERS EMPRESS BRIDGE SUTLEJ PUNJAB INDIA ASIA PAKISTAN 108 WATSOONN THE RECONSTRUCTION OF TH[MEinutes of The following Papers were submitted for discussion...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1934) 238 (1934): 100–122.
Published: 01 January 1934
...R D GWYTHER © Thomas Telford and ICE 1934 COODE WILSON MITCHELL & VAUGHAN LEE SIR LINDSAY PARKINSON IMPROVEMENT HARBOURS TRAFFIC SHIPS BERTHING PIERS COFFERDAMS RECONSTRUCTION HEADS PROTECTION WORKS DREDGING SWEEPING ST HELIER JERSEY CHANNEL ISLANDS...
Journal Articles
SIR C HINDLEY, SIR G HEARN, B B HASKEW, J M LACEY, H W S HUSBANDS, A S BUCKLE, C T A HANSSEN, E P ANDERSON
Minutes of the Proceedings of the Institution of Civil Engineers (1934) 237 (1934): 131–145.
Published: 01 January 1934
...SIR C HINDLEY; SIR G HEARN; B B HASKEW; J M LACEY; H W S HUSBANDS; A S BUCKLE; C T A HANSSEN; E P ANDERSON © Thomas Telford and ICE 1934 EMPRESS BRIDGE BRIDGES RECONSTRUCTION RIVERS RAILWAYS TRAINING WORKS SHORTENING OSCILLATIONS PIERS GIRDERS ALIGNMENT BANKS GUIDEBANKS...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1934) 237 (1934): 146–162.
Published: 01 January 1934
...S BLENCOWE; W T EVERALL; H J FEREDAY; E LATHAM; F G ROYAL DAWSON; J D WATSON; W MACRAE © Thomas Telford and ICE 1934 EMPRESS BRIDGE BRIDGES RECONSTRUCTION RIVERS RAILWAYS TRAINING WORKS SHORTENING SCOUR OSCILLATIONS GIRDERS SPANS LOADS BUNDS GUIDEBANKS PILES CAISSONS...
Journal Articles
A A BARNES, W J E BINNIE, G B CARLETON, H H DARE, H J DEANE, C COSTLEY WHITE, F W FURKERT, W T HALCROW, S W JONES, S MCCONNEL, F W MACAULAY, G HASKINS, J PARR, E G RITCHIE, T STEWART, F C TEMPLE
Minutes of the Proceedings of the Institution of Civil Engineers (1932) 234 (1932): 73–102.
Published: 01 January 1932
... TESTING STRENGTHENING PRESSURE TUNNELS TESTS URBAN WATERWORKS MAINS INCRUSTATION PIPES DISCHARGES CAST IRON PIPELINES DAMS RESERVOIRS ROCKS GEOLOGY LININGS QUALITY CONCRETE FAILURES GROUTING CRACKS CAVITY STEEL RECONSTRUCTION PROTECTION CORROSION WATER COATINGS HEIGHTENING...
Journal Articles
D R DAVILA, J M GAVIN, J MITCHELL, O B RATTENBURY, E G WALKER, W F STANTON, A G LE CLERCQ, A G L CLERCQ
Minutes of the Proceedings of the Institution of Civil Engineers (1932) 233 (1932): 235–240.
Published: 01 January 1932
...D R DAVILA; J M GAVIN; J MITCHELL; O B RATTENBURY; E G WALKER; W F STANTON; A G LE CLERCQ; A G L CLERCQ IMPROVEMENT PORTS EXTENSIONS BREAKWATERS HARBOURS WAVES CREST FAILURES DESTRUCTION ACCIDENTS RECONSTRUCTION FOUNDATIONS SAND DEPTH DREDGING WATER SEA DREDGERS CUTTERS...
Journal Articles
SIR G W HUMPHREYS, SIR C HINDLEY, W J E BINNIE, A NEWLANDS, H J FEREDAY, W L LOWE BROWN, W L L BROWN, F A EUSTACE, H W S HUSBANDS
Minutes of the Proceedings of the Institution of Civil Engineers (1931) 232 (1931): 220–231.
Published: 01 January 1931
... in havinga hollow pier ; in fact, Telford had used them on the Menai suspension bridge, which was still standing. Mr. Minnitt s reply to theDiscussion will be found a t p. 240,- SEC.INSTC. .E. © Thomas Telford and ICE 1931 WASHAWAY RECONSTRUCTION BRIDGES RAILWAYS RIVERS DAMAGE FLOODS...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1931) 232 (1931): 232–242.
Published: 01 January 1931
.... Somewhat similar foundation conditions had been encountered by him recently in the reconstruction of the Ngaruawahia bridge across the Waikato river on the Auckland-Wellington main trunk line, of which the following was a description :A new bridge was constructed close alongside the old structure, the new...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1931) 232 (1931): 145–154.
Published: 01 January 1931
...M B BUXTON; J E HARRISON; A LEITCH; J B L MEEK; E G WALKER; J H WALKER; R BRUCE © Thomas Telford and ICE 1931 ROADS MOUNTAINS IMPROVEMENT HIGHWAYS RECONSTRUCTION BRIDGES ENVIRONMENT LANDSCAPE COSTS AESTHETICS BRIDGEWORKS CURVES GRADIENTS WIDTH CARRIAGEWAYS CONCRETE...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1931) 232 (1931): 113–130.
Published: 01 January 1931
..., a coach travelling at an average speed of 6 miles per hour was considered to be a very fast vehicle. No works of any great magnitude appear to have been executed after Telford s time until 1924, when the Government decided to allocate a 100-per-cent. grant for the reconstruction of the road from Inverness...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1931) 231 (1931): 112–135.
Published: 01 January 1931
... REMOVAL SILT DEPOSITS FANS EXCLUSION RECONSTRUCTION LOADING SYSTEMS WORKS LOADS PUMPING MACHINERY RISING FAILURES CAIRO AMERIA EGYPT AFRICA 112 PINSON O N CAIRO MAIN DRAINAGE EXTENGIONS. [Minutes of Associate Members--oontinued. 1ALANCARRINGTOWNILSOGNE.ORGLEEWWISORCESTEBR.S...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1931) 232 (1931): 155–182.
Published: 01 January 1931
...G C MINNITT INDIA ASIA © Thomas Telford and ICE 1931 BRAITHWAITE WASHAWAY RECONSTRUCTION BRIDGES RAILWAYS RIVERS DAMAGE PIERS TRAFFIC FLOODS GEOLOGY ALIGNMENT STEEL ERECTION SPANS STEELWORK TRESTLES FERROCRETE BRICKS BLOCKS BOX ABUTMENTS EARTHWORKS LABOUR...
Journal Articles
SIR G W HUMPHREY, SIR H MAYBURY, SIR M MACDONALD, SIR A GIBB, T P FRANK, F C COOK, F G ROYAL DAWSON, H W S HUSBANDS, R BRUCE, J MITCHELL
Minutes of the Proceedings of the Institution of Civil Engineers (1931) 232 (1931): 131–145.
Published: 01 January 1931
... SURFACING MATERIALS BITUMEN SURFACES BITUMINOUS CURVES GRADIENTS SUPERELEVATION REINFORCED SLABS ALIGNMENT RAFTS RECONSTRUCTION GROUND CONDITIONS MARSHES EASEMENTS PEAT BOGS MOUNTAINOUS GRAMPIANS SCOTLAND GREAT NORTH RD INVERNESS PERTH HIGHLANDS UK Discussion...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1930) 229 (1930): 114–126.
Published: 01 January 1930
...SIR L SAVILE; H A REED; C H SANDEMAN; A BINNS; N G GEDYE; G S JACOB; J MITCHELL © Thomas Telford and ICE 1930 DOCKYARDS WIDENING BASINS ENTRANCES DOCKS RECONSTRUCTION GRAVING GATES SINGLE LEAF SINGLE LEAF LEAVES CAISSONS DAMS COSTS DRY ALTERATIONS CONCRETE ACCIDENTS...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1930) 229 (1930): 97–113.
Published: 01 January 1930
...J MITCHELL © Thomas Telford and ICE 1930 J WATT SANDEMAN RECONSTRUCTION GRAVING DOCKS ENTRANCES GATES SINGLE LEAF SINGLE LEAF LEAVES SHIPS COFFERDAMS PILING QUAYS WALLS PILES EXCAVATING DRIVING CONCRETE PITCH CULVERTS FILL FILLING MILD STEEL RIBS PUMPING...
Journal Articles
W W GRIERSON, F PALMER, A NEWLANDS, H J FEREDAY, H M MORGANS, S C LEWIS, E P ANDERSON, SIR G HUMPHREYS, H D SMITH, J ALEXANDER
Minutes of the Proceedings of the Institution of Civil Engineers (1930) 230 (1930): 132–138.
Published: 01 January 1930
...W W GRIERSON; F PALMER; A NEWLANDS; H J FEREDAY; H M MORGANS; S C LEWIS; E P ANDERSON; SIR G HUMPHREYS; H D SMITH; J ALEXANDER RECONSTRUCTION VIADUCTS MAINTENANCE TIMBER METALS PROTECTION REINFORCEMENT PIERS DECKS SPANS PITCHING GIRDERS CORROSION COLUMNS CAST IRON SALTASH...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1930) 230 (1930): 100–114.
Published: 01 January 1930
...H D SMITH © Thomas Telford and ICE 1930 ROYAL ALBERT BRIDGES IK BRUNEL RECONSTRUCTION VIADUCTS APPROACHES SPANS PIERS GIRDERS RAILWAYS ERECTION SALTASH TAMAR ROYAL ALBERT CORNWALL DEVON LISKEARD UK 100 SMITH ON LISKEARD VIADUCT [Minutes of Associate Members...
Journal Articles
Minutes of the Proceedings of the Institution of Civil Engineers (1930) 230 (1930): 234–258.
Published: 01 January 1930
...W T EVERALL © Thomas Telford and ICE 1930 RENDEL PALMER & TRITTON INDIAN STATE RAILWAYS RECONSTRUCTION BRIDGES RIVERS RAILWAYS DEFECTS GIRDERS STRESS RECORDERS PIERS FOUNDATIONS SUPERSTRUCTURES CONSTRUCTION COFFERDAMS REMODELLING CRANES ERECTION METHODS LIVE...
Journal Articles
W W GRIERSON, F PALMER, SIR C HINDLEY, HJ FEREDAY, E P ANDERSON, SIR G HEARN, H W S HUSBANDS, J BICKLEY, L H SWAIN, B B HASKEW, W T EVERALL
Minutes of the Proceedings of the Institution of Civil Engineers (1930) 230 (1930): 259–273.
Published: 01 January 1930
... screw on to the cylinder so as to force the cylinder down and enable the pile-screw .to bite again, was very ingenious. I n regard to the reconstruction of the Attock bridge, to renew girders of big bridges with 300-foot and 250-foot spans under traffic and without any delay was no child s play. He...
