Skip to Main Content
Article navigation
Purpose

– The purpose of this paper is to study how operations strategy (OS) innovation occurs in a project-centred production and organisation.

Design/methodology/approach

– A longitudinal case study encompassing the processes at the headquarters of the company and in two projects using lean.

Findings

– The operation strategy development commences at a middle level in the organisation, is underpinned and embedded in production projects and only after several years becomes embedded in the corporate operation strategy. Projects use lean principles in a differentiated manner.

Research limitations/implications

– A qualitative case study provides insight into only a single occasion of change in OS. More case studies would probably reveal several paths of OS development. OS development need to be handled as emergent, political and with contributions from several managers and management levels, bridging the vertical divides between projects and headquarter.

Practical implications

– A conscious and systematic vertical integration and interaction is crucial in project-based companies doing operation strategy development, something critically difficult at building contractors.

Originality/value

– The present study contributes to the small body of studies of OS development processes, by providing insight in how project-based companies renew their operation strategy.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Please sign in to your personal account to gift article access.

Register

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses.

You have reached the limit of 10 links within a 30 day period.