Concurrent engineering or concurrent new product development (CNPD) is gradually becoming the norm for developing and introducing new products to the market place. Through the use of three in‐depth case studies looks at the seldom discussed problems in CNPD implementation and day‐to‐day management, and tries to provide a clear picture of the current state of its development, at three companies in three different countries across Europe. Identifies a number of issues emerging from the study, in particular the lack of process understanding for a concurrent or integrated product development effort and the abundance of “organisational” factors as the main barrier to its success. The results identified both differences and commonalties in CNPD experiences between each of the three case study companies. The case studies highlight the importance of process management, with a focus on process modelling and analysis of organisational factors, to improve the existing implementations of CNPD.
Article navigation
1 May 2003
This article was originally published in
Integrated Manufacturing Systems
Case Report|
May 01 2003
Problems in concurrent new product development: an in‐depth comparative study of three companies Available to Purchase
Badr Haque
Badr Haque
Warwick Manufacturing Group, University of Warwick, Coventry, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-583X
Print ISSN: 0957-6061
© MCB UP Limited
2003
Integrated Manufacturing Systems (2003) 14 (3): 191–207.
Citation
Haque B (2003), "Problems in concurrent new product development: an in‐depth comparative study of three companies". Integrated Manufacturing Systems, Vol. 14 No. 3 pp. 191–207, doi: https://doi.org/10.1108/09576060310463154
Download citation file:
296
Views
Suggested Reading
Design for Six Sigma: Launching New Products and Services without Failure
The TQM Magazine (August,2002)
Concurrent engineering for bespoke products
Assembly Automation (March,1995)
Concurrent Engineering Fundamentals Volumes 1 & 2
Assembly Automation (September,1999)
Competitive edge and environmentally‐ conscious design through concurrent engineering
Assembly Automation (June,1999)
Concept testing of Internet services
European Journal of Innovation Management (December,2002)
Related Chapters
A Pathway towards Truly Sustainable Food Supply Chains: Balancing Motivation, Strategy, and Impact
Organizing Supply Chain Processes for Sustainable Innovation in the Agri-Food Industry
Case study – a typical extension of time claim under a JCT contract
Delay and Disruption Claims in Construction
Case study – a compensation event claim on an infrastructure project under an NEC3 contract
Delay and Disruption Claims in Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
