Skip to Main Content
Skip Nav Destination

This paper is mainly concerned with studying the e‐manufacturing scheduling issue based on the bills of materials (BOM) flows of products. On the basis of e‐manufacturing philosophy, a genetic algorithm (GA)‐based scheduling model for physical e‐manufacturing cells is put forward. By means of building the mapping relationship and dynamic task association among physical e‐manufacturing cells, logic e‐manufacturing cells, e‐manufacturing systems and e‐manufacturing environment, high‐level scheduling issues can be transformed as an inductive procedure concerning the scheduling results to corresponding physical e‐manufacturing cells. As verification, finally, a case study is given to demonstrate the method mentioned above.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal