Mechanisms to adjust planned lead times based on current work loads are desirable for time‐phased planning systems. This paper investigates the use of exponentially smoothed order flow time feedback in setting planned lead times dynamically. The system studied is a supply chain with capacity‐constrained processing stations and transit times between stations. Lot sizes are based on the minimization of flow times using queuing approximations. Both seasonal and level demand patterns with uncertainty are considered. Since both dependent and independent demands are assumed at each station, customer delivery performance depends on the distribution of inventory along the supply chain. Results show that dynamic planned lead time setting can be used effectively to control delivery performance along the supply chain. Performance is also influenced significantly by appropriate lot size selection.
Article navigation
1 January 2004
Research Article|
January 01 2004
Work load responsive adjustment of planned lead times
S.T. Enns;
S.T. Enns
S.T. Enns is an Associate Professsor, in the Department of Mechanical and Manufacturing Engineering, University of Calgary, Canada.
Search for other works by this author on:
Pattita Suwanruji
Pattita Suwanruji
Pattita Suwanruji is a PhD Candidate, in the Department of Mechanical and Manufacturing Engineering, University of Calgary, Canada.
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-7786
Print ISSN: 1741-038X
© Emerald Group Publishing Limited
2004
Journal of Manufacturing Technology Management (2004) 15 (1): 90–100.
Citation
Enns S, Suwanruji P (2004), "Work load responsive adjustment of planned lead times". Journal of Manufacturing Technology Management, Vol. 15 No. 1 pp. 90–100, doi: https://doi.org/10.1108/09576060410512365
Download citation file:
New and popular articles
Suggested Reading
MediSeal GmbH improves pharmaceutical packaging efficiency for small batch sizes
Assembly Automation (April,2007)
Evaluating Lot‐sizing Performance in Multi‐level MRP Systems: A Comparative Analysis of Multiple Performance Measures
International Journal of Operations & Production Management (November,1993)
Origin of the Economic Order Quantity formula; transcription or transformation?
Management Decision (October,2005)
Developing a conceptual model of lead performance measurement and benchmarking: A multiple case analysis
International Journal of Operations & Production Management (November,2008)
Service postponement: Translating manufacturing postponement to service operations
Journal of Manufacturing Technology Management (May,2010)
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.