Article navigation

It has been brought to the attention of the publisher that the paper Vinod K.T., S. Prabagaran and O.A. Joseph (2019), “Dynamic due date assignment method: a simulation study in a job shop with sequence-dependent setups”, published in the Journal of Manufacturing Technology Management, Vol. 30 No. 2, pp. 421-437, https://doi.org/10.1108/JMTM-06-2017-0112, was published in the wrong issue due to an editorial error. Emerald sincerely apologises to the authors and readers for any inconvenience caused.

The paper has been removed from the issue, and will be published in the forthcoming special issue “CPIE 2016”.

When citing the article, please cite: Vinod K.T., S. Prabagaran and O.A. Joseph (2019), “Dynamic due date assignment method: a simulation study in a job shop with sequence-dependent setups”, published in the Journal of Manufacturing Technology Management, https://doi.org/10.1108/JMTM-06-2017-0112.

or Create an Account

Close subscription notice
Close access options