Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-12 of 12
Keywords: CADCAM
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Integrated Manufacturing Systems (1998) 9 (2): 120–128.
Published: 01 April 1998
... the boundary edge path being removed, and the face set including the boundary edge path being removed. The three interaction cases in the last group require modification procedures that perform three functions: © MCB UP Limited 1998 CADCAM Design Interaction Recognition 1. 1First, one...
Journal Articles
Integrated Manufacturing Systems (1998) 9 (2): 99–108.
Published: 01 April 1998
... to the second and blow moulding stage. Here air is blown through the core rod to expand the conditioned preform against a cold, usually aluminium, blow mould cavity. The finished part is transferred to the third stage where it is ejected from the machine. © MCB UP Limited 1998 CADCAM Design...
Journal Articles
Integrated Manufacturing Systems (1994) 5 (4-5): 22–29.
Published: 01 December 1994
... CADCAM IT Models Product development The proposed feature representation scheme is shown in Figure 2 . The form feature Step 1 is used to illustrate the detailed data structure. The scheme is intended to unify all feature related data including its name, type, volume, surface and entry faces...
Journal Articles
Integrated Manufacturing Systems (1994) 5 (4-5): 41–47.
Published: 01 December 1994
... estimated that automation of this process would save companies $10,000 to $250,000 annually and would reduce the development time for new process plans for prototype parts by an average of 50 to 75 per cent[ 2 ]. © MCB UP Limited 1994 Automated operations CADCAM Computer‐aided process...
Journal Articles
Integrated Manufacturing Systems (1994) 5 (3): 20–28.
Published: 01 September 1994
... transformed the effectiveness of operations. The company′s investments were based on a prudent assessment of its current and planned product range, existing and planned manufacturing facilities,the scale of its operations and business objectives. © MCB UP Limited 1994 CADCAM Communications...
Journal Articles
Integrated Manufacturing Systems (1994) 5 (1): 14–22.
Published: 01 March 1994
... were produced by the production co‐ordinator; preliminary drawings were issued to the production engineering manager by the designer. © MCB UP Limited 1994 CADCAM Customers FMS Integration Product design Product development Quality Time‐to‐market The competitive arena has...
Journal Articles
Integrated Manufacturing Systems (1993) 4 (4): 29–36.
Published: 01 April 1993
... facilities, and the development of the new system. © MCB UP Limited 1993 CADCAM Data collection Data processing Engineering Systems integration INTEGRATION OF CAD/CAM AND SPREADSHEET DATA PROCESSING 29 A world-class cutting-toolmanufacturer has developed on integrated system which creates...
Journal Articles
Integrated Manufacturing Systems (1992) 3 (2): 9–14.
Published: 01 February 1992
... the companies to maintain competitive edge. © MCB UP Limited 1992 Manufacturing industry Product design Strategic planning CADCAM MAKE OR BUY: THE STRATEGIC PRODUCT DESIGN CHOICE 9 T wo case studies, of a machine tool manufacturer and a railway brake company, are used for analysis...
Journal Articles
Integrated Manufacturing Systems (1992) 3 (1): 4–12.
Published: 01 January 1992
... introduces about 12 systems. Studies 31 systems and lists them in the Appendix based on 60 references. Comments on future research directions. © MCB UP Limited 1992 CADCAM Parts Process control Computer‐aided process planning Recognition 4 INTEGRATED MANUFACTURING SYSTEMS 3,1 F eature...
Journal Articles
Integrated Manufacturing Systems (1990) 1 (4): 187–189.
Published: 01 April 1990
... in manufacturing environments where the number of machining operations makes the problem complex. Concludes that an ACTS expert system module can offer possibilities of total design systems when combined with CADCAM. Knowledge base Selecting tools like the expert engineer will intuitively use such factors...
Journal Articles
Integrated Manufacturing Systems (1990) 1 (4): 190–195.
Published: 01 April 1990
...C.B. Besant; M. Ristic; P. Champ; E.P. Jansen; R.A. Hancke; L. Hatziconstantis Presents a distributed manufacturing system concept designed to address the problem of flexibility in providing a variety of parts in small to medium batches. Discusses links with CADCAM hardware structure levels...
Journal Articles
Integrated Manufacturing Systems (1990) 1 (1): 31–34.
Published: 01 January 1990
...I.B. Brodbeck Examines the facts that have led to the adoption of an FMS installation and CADCAM system. Discusses the requirements of the installation: complete machining, off‐line tool and jig preparation,full computer integration, and organisation of resources. Concludes that although...
