Keywords: MRP
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Integrated Manufacturing Systems (1996) 7 (4): 34–38.
Published: 01 August 1996
...‐term chaos that was gradually enveloping them. The main features of the new structure were: Capacity management MRP Scheduling There is strong evidence[ 1 , 2 , 3 ] that the MRP approach has provided major benefits to firms employing it; however the market pressures in today’s...
Journal Articles
Integrated Manufacturing Systems (1992) 3 (3): 27–30.
Published: 01 March 1992
... that the flexibility of Materials Requirements Planning (MRP) is lower than for the other systems. In addition to the systems in Figure 2, a system has been developed within the ASEA group[5], called the Queue Number System (QNS). This system has been successfully 28 INTEGRATED MANUFACTURING SYSTEMS 3,3 order...
Journal Articles
Integrated Manufacturing Systems (1991) 2 (4): 14–26.
Published: 01 April 1991
...Gustavo A. Vargas; Roger G. Dear The effectiveness of alternative buffering strategies in complex multilevel assembly manufacturing systems using the Material Requirement Planning (MRP) methodology is explored and assessed. The safety stock,safety lead time, “hard” safety capacity, and forecast...
Journal Articles
Integrated Manufacturing Systems (1991) 2 (1): 30–32.
Published: 01 January 1991
... a considerable effect on performance criteria. With adequate resources and retrieval of information from the MRP system, the use of structured rules enables the master production schedule to be revised to reflect changes in the anticipated demand and capacity. 30 INTEGRATED MANUFACTURING SYSTEMS 2,1 The adoption...

or Create an Account

Close Modal
Close Modal