Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: Machinery
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
A sequential model for concurrent expansion in machinery and buildings using reinvested earnings
Available to Purchase
Integrated Manufacturing Systems (1997) 8 (4): 223–230.
Published: 01 August 1997
... and machines needs to be phased so as to benefit from added capital from reinvested earnings. Describes a dynamic integer model suitable for such investment scheduling. Suggests that the model was solved with a readily implementable heuristic which employs suitable decision rules for scheduling machinery...
Journal Articles
Multi‐stage Clustering: Parts and Machines Grouping
Available to Purchase
Integrated Manufacturing Systems (1993) 4 (3): 22–31.
Published: 01 March 1993
... Cellular manufacturing Cluster analysis Group technology Machinery Manufacturing systems ...
Journal Articles
Improving Machine Productivity
Available to Purchase
Integrated Manufacturing Systems (1993) 4 (3): 32–36.
Published: 01 March 1993
... manufacture spindle speeds of 15,000 rev/min are required, in conjunction with multiknife cutter block assemblies (Figure 3). Recently large increases of computerized technology have been incorporated into woodworking machinery. Examples of such technology have been CNC control of high-speed routers...
Journal Articles
The Case for Condition Based Maintenance
Available to Purchase
Integrated Manufacturing Systems (1991) 2 (3): 19–24.
Published: 01 March 1991
...Paul Prickett; Simon Eavery The introduction of ever more complicated machinery and associated operating procedures is placing an increasing strain on the maintenance function. The options available to a company engaged in the manufacture of a range of sheet metal products, for which a flexible...
