Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-2 of 2
Keywords: Value stream mapping
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Adaptation of the value stream mapping approach to the design of lean engineer-to-order production systems: A case study
Available to Purchase
Journal of Manufacturing Technology Management (2014) 25 (3): 334–350.
Published: 01 April 2014
...D.T. Matt Purpose – The purpose of this research is to examine relevant parts of the case of an Italian steel construction company's green field plant design process to identify best practice guidelines for the adaptation and use of value stream mapping (VSM) in the design of lean engineer...
Journal Articles
Improvement of manufacturing operations at a pharmaceutical company: A lean manufacturing approach
Available to Purchase
Journal of Manufacturing Technology Management (2011) 23 (1): 56–75.
Published: 16 December 2011
... line, the 5‐whys methodology was followed. The current state value stream map (VSM) has been developed after making several company visits and necessary computations. For improvement of the system, various lean strategies have been proposed and the future state VSM developed. Findings...
