Decision-making to determine the preferred way of upgrading or constructing new developments is becoming more complex. In the drive towards sustainability, the social, economic and environmental aspects now share equal weighting with the technical and cost-effective elements of each option. The process of evaluating trade-offs between, say, cost benefits and environmental or social disbenefits, has always been difficult, and it is now also important to demonstrate openness in decision-making, so that stakeholders can see the option selected is in fact the best possible within the constraints set. A simple multi-criteria approach, known as WISPS (wastewater integrated system performance score) has been applied in a theoretical study using actual data to decide which of four catchments in a Scottish water authority area should be prioritized for improvement. This approach follows closely the process which the engineers would use implicitly to make decisions, but has the benefit of formalizing the process, thus showing how these decisions were achieved. The robustness of the approach has been tested using two software packages: one for risk assessment (@RISK) utilizing Monte Carlo simulation; and the other, a complex multi-criteria decision support tool (ELECTRE). The more complex analytical approaches demonstrated that the simple WISPS method produced reliable results.
Article navigation
September 2000
Research Article|
September 01 2000
Making decisions for upgrading wastewater systems
D. J. Blackwood, BSc, MSc, PhD, CEng, MICE, MCIOB;
D. J. Blackwood, BSc, MSc, PhD, CEng, MICE, MCIOB
Senior Lecturer
Urban Water Technology Centre, University of Abertay
Dundee
Search for other works by this author on:
R.M. Ashley, BSc, MPhil, CEng, MICE, MCIWEM;
R.M. Ashley, BSc, MPhil, CEng, MICE, MCIWEM
Professor of Urban Water
Department of Civil Engineering, University of Bradford
Search for other works by this author on:
M. Petrie, BEng, PhD, CEng, MCIWEM;
M. Petrie, BEng, PhD, CEng, MCIWEM
Project Engineer
North of Scotland Water Authority
Dundee
Search for other works by this author on:
C. Oltean-Dumbrava, MSc, MA, PhD, MCIOB;
C. Oltean-Dumbrava, MSc, MA, PhD, MCIOB
Lecturer
School of Science and Engineering, University of Abertay
Dundee
Search for other works by this author on:
C. Jones, BSc, MSc
C. Jones, BSc, MSc
Business Customer Services Adviser
East of Scotland Water Authority
Edinburgh
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1751-7699
Print ISSN: 0965-0903
© 2000 Thomas Telford Ltd
2000
Proceedings of the Institution of Civil Engineers - Municipal Engineer (2000) 139 (3): 171–180.
Citation
Blackwood DJ, Ashley R, Petrie M, Oltean-Dumbrava C, Jones C (2000), "Making decisions for upgrading wastewater systems". Proceedings of the Institution of Civil Engineers - Municipal Engineer, Vol. 139 No. 3 pp. 171–180, doi: https://doi.org/10.1680/muen.2000.139.3.171
Download citation file:
New and popular articles
Suggested Reading
Cambridge Handbook of Organizational Project Management
International Journal of Managing Projects in Business (March,2018)
Management – How to Do it
The Electronic Library (August,2000)
Prioritizing decision criteria of flexible manufacturing systems using fuzzy TOPSIS
Journal of Manufacturing Technology Management (September,2017)
Civil engineering career management—the unwritten rules
Civil Engineering Innovation (March,2007)
The Gower Handbook of Management (4th ed.)
Library Management (June,1999)
Related Chapters
Chapter 5 The different phases in construction – design in health and safety to the project life cycle
ICE manual of health and safety in construction
Chapter 6 Establishing operational control processes
ICE manual of health and safety in construction
Chapter 7 Occupational health and safety management systems
ICE manual of health and safety in construction
Recommended for you