Over the past ten years, Blackpool Council has undertaken several major capital works schemes within a partnering environment. During this period, the council has sought to develop the partnering process with a view to optimising the design, construction and commissioning of projects. Currently engaged in the £64 million central area coast protection scheme under a partnering contract, numerous advantages over traditional forms of contract have been realised. This paper outlines the process of partnering through contract selection and administration. The method of incentivisation through the use of key performance indicators and associated benchmarking is also described. The effect of partnering and early contractor involvement on product quality is highlighted through improved buildability and defect minimisation. Allied to this, the centralised and inclusive environment fostered by partnering contracts has lent itself to improved health and safety throughout design, construction and commissioning. Finally, the wider benefits of the partnering approach for the local community and the delivery of quality urban regeneration are described.
Article navigation
March 2007
Research Article|
March 01 2007
Partnering contracts in practice at Blackpool, UK
L. S. Cunningham, PhD, CEng, MICE;
L. S. Cunningham, PhD, CEng, MICE
Project Engineer
Blackpool Council Technical Services
Blackpool, UK
Search for other works by this author on:
M. A. Pomfret, MSc, CEng, CEnv, MICE
M. A. Pomfret, MSc, CEng, CEnv, MICE
Group Engineer
Blackpool Council Technical Services
Blackpool, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
July 14 2006
Accepted:
January 29 2007
Online ISSN: 1751-7699
Print ISSN: 0965-0903
© 2007 Thomas Telford Ltd
2007
Proceedings of the Institution of Civil Engineers - Municipal Engineer (2007) 160 (1): 17–21.
Article history
Received:
July 14 2006
Accepted:
January 29 2007
Citation
Cunningham LS, Pomfret MA (2007), "Partnering contracts in practice at Blackpool, UK". Proceedings of the Institution of Civil Engineers - Municipal Engineer, Vol. 160 No. 1 pp. 17–21, doi: https://doi.org/10.1680/muen.2007.160.1.17
Download citation file:
New and popular articles
Suggested Reading
Causes of beach lowering at Dunbar, Eastern Scotland, UK
Maritime Engineering (December,2006)
Sediment transport through rock groynes on mixed beaches
Maritime Engineering (June,2008)
A phase-averaged non-linear wave transformation model
Maritime Engineering (June,2010)
Managed realignment–lessons from Wallasea, UK
Maritime Engineering (June,2008)
Planning and implementing coastal management in Sri Lanka
Civil Engineering Innovation (March,2007)
Related Chapters
Civil engineering projects
Civil Engineering Procedure
Concept and promotion of a civil engineering project
Civil Engineering Procedure
Design
Civil Engineering Procedure
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.