The following amendment has been identified to the paper printed in Proceedings of the Institution of Civil Engineers – Municipal Engineer 165(1): 11–17, http://dx.doi.org/10.1680/muen.2012.165.1.11.
Page 12, section 4 currently reads
The city of Stirling has 355 bores and associated infrastructure that represents a A$32·5 million irrigation asset. This system is designed to irrigate 740 hectares and to deliver a total output of 555 000 kilolitres per annum.
This should correctly read
The city of Stirling has 355 bores and associated infrastructure that represents a A$32·5 million irrigation asset. This system is designed to irrigate 740 hectares and to deliver a total output of 5230 kilolitres per annum.