Traditionally, in the Netherlands, the procurement procedure for infrastructure does not start until the public decision-making procedure is fully completed. In the new procurement strategy, early contractor involvement is applied by carrying out the procurement procedure and the public planning procedure simultaneously. This article explores the first experiences and lessons learned with early contractor involvement in four Dutch infrastructure projects. It can be concluded that the new strategy adds value in terms of time gains, improved project control and more innovative solutions. However, to optimize early contractor involvement, the differences between the competitive procurement procedures and the open, cooperative public planning procedures need to be bridged.
Article navigation
1 March 2012
Research Article|
March 01 2012
Early contractor involvement in dutch infrastructure development: Initial experiences with parallel procedures for planning and procurement Available to Purchase
Sander Lenferink;
Sander Lenferink
Faculty of Spatial Sciences, University of Groningen
Search for other works by this author on:
Jos Arts;
Jos Arts
Faculty of Spatial Sciences, University of Groningen
Search for other works by this author on:
Taede Tillema;
Taede Tillema
Ministry of Transport, the Netherlands
Search for other works by this author on:
Marcelle van Valkenburg;
Marcelle van Valkenburg
Rijkswaterstaat, Ministry of Transport, the Netherlands
Search for other works by this author on:
Roel Nijsten
Roel Nijsten
Ministry of Transport, the Netherlands
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 2150-6930
Print ISSN: 1535-0118
Copyright © 2012 by PrAcademics Press
2012
licensed reuse rights only
Journal of Public Procurement (2012) 12 (1): 4–42.
Citation
Lenferink S, Arts J, Tillema T, van Valkenburg M, Nijsten R (2012), "Early contractor involvement in dutch infrastructure development: Initial experiences with parallel procedures for planning and procurement". Journal of Public Procurement, Vol. 12 No. 1 pp. 4–42, doi: https://doi.org/10.1108/JOPP-12-01-2012-B001
Download citation file:
Suggested Reading
INFORMAL DISCUSSION. THE USE OF ENVIRONMENTAL IMPACT ASSESSMENTS (EIA`S) IN THE PREPARATION OF MAJOR DEVELOPMENTS.
Proceedings of the Institution of Civil Engineers (August,1975)
Simulating thermal behaviour of concrete by FEA: state-of-the-art review
Proceedings of the Institution of Civil Engineers - Construction Materials (January,2016)
SOME CONSIDERATIONS OF SUBMERGED TUNNELLING.
Proceedings of the Institution of Civil Engineers (April,1971)
The social shaping of the early business schools in The Netherlands: Professions and the power of abstraction
Journal of Management History (April,2010)
Related Chapters
References
Immersed tunnel techniques
Constructing the Piet Heintunnel and the Wijkertunnel
Immersed tunnel techniques 2
1. Geotecknical aspects of the Zeebiirgertunnel in Amsterdam
Immersed tunnel techniques
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.