Early involvement of the construction team is increasingly utilized in demanding projects to incorporate versatile expertise in their planning. For public owners this is a challenge since they are obliged to use competitive, transparent team selection based on the ‘most economically advantageous’ criterion which ensures that both price and quality viewpoints are taken into account. In the case of early involvement, the price component naturally does not include the total price, but may consist only of the fee-percentages of competing service providers. This study examines such a selection situation in project alliancing in the European context and seeks to find a way to integrate the fee component in a multi-criteria selection system and determine reasonable fees for different levels of capabilities. The study builds on the performance difference between different capabilities, derived from a survey of practitioners, and determines an indifference curve arithmetically for the planning of a selection method. The influence of the owner‘s risk attitude and risk premiums are also considered exploratively based on the pricing methods of the theory of finance.
Article navigation
1 March 2013
Research Article|
March 01 2013
Determining ‘the most economically advantageous tender’ based on capability and fee-percentage criteria
Pertti Lahdenperä
Pertti Lahdenperä
VTT Technical Research Centre of Finland
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 2150-6930
Print ISSN: 1535-0118
Copyright © 2013 by PrAcademics Press
2013
licensed reuse rights only
Journal of Public Procurement (2013) 13 (4): 409–446.
Citation
Lahdenperä P (2013), "Determining ‘the most economically advantageous tender’ based on capability and fee-percentage criteria". Journal of Public Procurement, Vol. 13 No. 4 pp. 409–446, doi: https://doi.org/10.1108/JOPP-13-04-2013-B001
Download citation file:
New and popular articles
Suggested Reading
Assessing the cost of competitive tendering in Ghana using transaction cost theory
Built Environment Project and Asset Management (March,2021)
Quantifying the cost implications of workplace health and safety measures during tendering in developing countries: evidence from Ghanaian construction industry
Engineering, Construction and Architectural Management (September,2025)
Do firms submit fewer tender bids with high inflation? An analysis of firms’ participation in public procurement in the EU
Journal of Public Procurement (October,2024)
Target cost contracts: an analysis of the interplay between fee, target, share and price
Engineering, Construction and Architectural Management (February,2000)
Related Chapters
References
10th Nordic Conference on Construction Economics and Organization
6 Tender adjudication
Project cost estimating
Pick a Number Between 0 and 100: An Examination of Percentage-Based Scales
Advances in Accounting Behavioral Research
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.