Previous research by Moore and White (2005) demonstrated the validity of a two-step regression approach to estimate total procurement cost growth. Although this study produced statistically significant findings, the resultant regression models relied on a predictor variable, First Unit Equipped, that appeared from a historic standpoint to be marginally populated in the database. To mitigate this limitation, this study addresses just two components of possible procurement cost growth for major DoD acquisition programs. These two areas consist of cost growth due to either physical changes to the system or program slippage or acceleration. In narrowing the scope of procurement cost growth, this study discovers more universal explanatory variables that can be used to predict whether specific types of cost growth will occur, and if so, by what expected percentage.
Article navigation
1 March 2007
Research Article|
March 01 2007
Predicting engineering and schedule procurement cost growth for major dod programs
Chris J. McDaniel;
Chris J. McDaniel
Air Force Cost Analysis Agency in Washington D.C.
Search for other works by this author on:
Edward D. White III
Edward D. White III
Department of Mathematics and Statistics at the Air Force Institute of Technology
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 2150-6930
Print ISSN: 1535-0118
Copyright © 2007 by PrAcademics Press
2007
licensed reuse rights only
Journal of Public Procurement (2007) 7 (3): 362–380.
Citation
McDaniel CJ, White III ED (2007), "Predicting engineering and schedule procurement cost growth for major dod programs". Journal of Public Procurement, Vol. 7 No. 3 pp. 362–380, doi: https://doi.org/10.1108/JOPP-07-03-2007-B003
Download citation file:
Suggested Reading
The Implementation of an Electronic Retention Schedule
Records Management Journal (March,1997)
TIMETABLE ANALYSIS: A TOOL FOR SCHOOL ADMINISTRATORS
Journal of Educational Administration (January,1986)
Animation‐based construction schedule review
Construction Innovation: Information Process Management (September,2001)
Work schedule, work schedule control and satisfaction in relation to work‐family conflict, work‐family synergy, and domain satisfaction
Career Development International (September,2010)
Shift schedule realignment and patient safety culture
Int J Health Care Qual Assur (January,2020)
Related Chapters
Quality Evaluation of Contractor’s Schedule in the Bidding Phase
10th Nordic Conference on Construction Economics and Organization
The Effectiveness of Schedule UTP: A Comparison of Multinational and Domestic Firms
Advances in Taxation
Activity Cruciality as Measure of Network Schedule Structure Resilience
10th Nordic Conference on Construction Economics and Organization
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.