You do not currently have access to this content.
Article navigation
August 1981
Research Article|
August 01 1981
INFORMAL DISCUSSION. FINANCIAL MANAGEMENT OF CONTRACTS-WHY THE ENGINEER MUST LEAD.
Publisher: Emerald Publishing
Online ISSN: 1753-7789
© Thomas Telford and ICE
1981
Proceedings of the Institution of Civil Engineers (1981) 70 (3): 597–599.
Citation
FAULKNER J, SPICER R, OHEHIR M (1981), "INFORMAL DISCUSSION. FINANCIAL MANAGEMENT OF CONTRACTS-WHY THE ENGINEER MUST LEAD.". Proceedings of the Institution of Civil Engineers, Vol. 70 No. 3 pp. 597–599, doi: https://doi.org/10.1680/iicep.1981.1793
Download citation file:
New and popular articles
Suggested Reading
INFORMAL DISCUSSION. SHOULD THE TRAINING OF ENGINEERS INCLUDE QUANTITY SURVEYING OR SHOULD THIS BE LEFT TO THE SPECIALISTS?
Proceedings of the Institution of Civil Engineers (August,1975)
INFORMAL DISCUSSIO. THE EMPLOYMENT OF QUANTITY SURVEYORS.
Proceedings of the Institution of Civil Engineers (June,1969)
CONTROL OF PROJECTS DURING CONSTRUCTION. DISCUSSION.
Proceedings of the Institution of Civil Engineers (August,1987)
INFORMAL DISCUSSION. HOW TO USE MANAGEMENT TOOLS.
Proceedings of the Institution of Civil Engineers (May,1970)
Lose the silver bullets
The Bottom Line (November,2014)
Related Chapters
Projects, Programmes, Strategy and Leadership in the Research Library
Project Management in the Library Workplace
Design and Designers
Role of Concrete Bridges in Sustainable Development: Proceedings of the International Symposium held at the University of Dundee, Scotland, UK on 3–4 September 2003
Characteristics of Non-Budget Firms: Strategy, Environment, Planning, Firm Performance Evaluations and Management Incentive Rewards
Advances in Management Accounting
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
