Open figure viewer
Keywords:
CONSTRUCTION,
DAMS,
TUNNELS,
CONCRETE,
AGGREGATES,
TEMPERATURE,
CABLEWAYS,
GROUTING,
SYSTEMS,
TIGNES DAM,
MALGOVERT TUNNE,
CASTELO DO BODE,
CLAERWEN DAM,
FRANCE,
PORTUGAL
This content is only available via PDF.
© Thomas Telford and ICE
1953
