You do not currently have access to this content.
Article navigation
1 October 1955
Research Article|
October 01 1955
SOME NOTES ON THE HALF-THROUGH TYPE PLATE-GIRDER RAILWAY BRIDGE. CORRESPONDENCE. Available to Purchase
Publisher: Emerald Publishing
© Thomas Telford and ICE
1955
Proceedings of the Institution of Civil Engineers (1955) 4 (5): 645–651.
Citation
LEWIS EM, TOMS AH, BRAMALL B, BERRIDGE PSA, EASTON FM (1955), "SOME NOTES ON THE HALF-THROUGH TYPE PLATE-GIRDER RAILWAY BRIDGE. CORRESPONDENCE.". Proceedings of the Institution of Civil Engineers, Vol. 4 No. 5 pp. 645–651, doi: https://doi.org/10.1680/ipeds.1955.27762
Download citation file:
Suggested Reading
BRIDGE ASSESSMENT. INTRODUCTION TO A SUITE OF PAPERS.
Proceedings of the Institution of Civil Engineers - Structures and Buildings (February,1995)
INFORMAL DISCUSSION. WORKS MAINTENANCE.
Proceedings of the Institution of Civil Engineers (August,1969)
CORRIGENDUM. RAILWAY MODERNIZATION CONFERENCE. THE ENGINEERING ASPECTS OF THE MODERNIZATION PLAN FOR BRITISH RAILWAYS.
Proceedings of the Institution of Civil Engineers (November,1961)
CORRIGENDUM. DEVELOPMENT IN OVERHEAD ELECTRIFICATION OF RAILWAYS AS IT AFFECTS THE CIVIL ENGINEER.
Proceedings of the Institution of Civil Engineers (June,1959)
THE WORK OF BRITISH RAILWAYS
Proceedings of the Institution of Civil Engineers (December,1968)
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
