Open figure viewer
Keywords:
UPPER TAME MAIN DRAINAGE AUTHORITY,
SEDIMENTATION,
DESIGN,
STORMWATER,
CLOSED CIRCUIT,
GRIT,
OPERATION,
REMOVAL,
EXCAVATION,
PLANT,
CONSTRUCTION,
REORGANISATION,
TELEVISION,
HYDRAULIC,
CONTROL,
PUMPHOUSES,
CONCRETE,
WORKS,
TANKS,
CCTV,
CHANNELS,
EFFLUENT,
SLUDGE,
INSTRUMENTATION,
MINWORTH,
UPPER TAME,
UK
This content is only available via PDF.
© Thomas Telford and ICE
1969
You do not currently have access to this content.
