Article navigation
November 1975
Discussion|
November 01 1975
DISCUSSION. FARAKKA BARRAGE PROJECT: A CHALLENGE TO ENGINEERS. Free
Publisher: Emerald Publishing
© Thomas Telford and ICE
1975
Proceedings of the Institution of Civil Engineers (1975) 58 (4): 667.
Citation
MOOKERJEA D, EDGECOMBE A (1975), "DISCUSSION. FARAKKA BARRAGE PROJECT: A CHALLENGE TO ENGINEERS.". Proceedings of the Institution of Civil Engineers, Vol. 58 No. 4 pp. 667, doi: https://doi.org/10.1680/iicep.1975.3565
Download citation file:
Suggested Reading
CORRESPONDENCE. THE STILL-WATER POCKET PRINCIPLE.
Journal of the Institution of Civil Engineers (October,1946)
DISCUSSION. RECENT IRRIGATION PROJECTS IN THE INDUS BASIN.
Proceedings of the Institution of Civil Engineers (February,1960)
CORRESPONDENCE. THE UHL RIVER HYDRO-ELECTRIC PROJECT.
Journal of the Institution of Civil Engineers (November,1941)
DISCUSSION. SOME NOTES ON THE KARUN RIVER AND THE SHATT EL ARAB. (INCLUDES PHOTOGRAPHS).
Journal of the Institution of Civil Engineers (January,1950)
DISCUSSION. NKULA FALLS HYDRP-ELECTRIC SCHEME INITIAL DEVELOPMENT.
Proceedings of the Institution of Civil Engineers (October,1969)
Related Chapters
What Is Development?
Rural Marketing as a Tool for National Development: Strategies for Socio-Economic Progress
Social Determinants of Greenhouse Gas Emissions in the Top 100 Developed and Developing Emitting Countries
Green House Gas Emissions Reporting and Management in Global Top Emitting Countries and Companies
Brief Overview of the Current State of Gifted Education in the Dominican Republic
Gifted Children of Color Around the World: Diverse Needs, Exemplary Practices, and Directions for the Future
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
