Open figure viewer
Keywords:
CEGB,
CENTRAL ELECTRICITY GENERATING BOARD,
GENERATING BOARD,
COOLING,
SYSTEMS,
DIRECT,
TURBINES,
PLANT,
PUMPHOUSES,
OPERATION,
DRY,
NATURAL,
REMOVAL,
ESTUARIES,
INTAKES,
CYCLES,
PUMPS,
ASSISTED,
WATER,
STATE OF THE ART,
RECIRCULATED,
CONDENSERS,
HEAT,
WORKS,
TOWERS,
MECHANICAL,
DEVELOPMENT,
SOURCES,
SEA,
EFFECT,
QUANTITY,
CONCRETE,
POWER STATIONS,
OPTIMISATION,
STEAM,
AUXILIARY,
DISSIPATION,
CHLORINATION,
WET,
DRAUGHT,
SHAPE,
LAKES,
ONCE THROUGH,
HYDRAULICS,
INLETS,
HYPERBOLOIDAL
This content is only available via PDF.
© Thomas Telford and ICE
1977
You do not currently have access to this content.
