Keywords: ALLT NA LAIRIGE
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers (1957) 7 (2): 416–419.
Published: 01 June 1957
... STREAMS HYDROELECTRICITY CATCHMENTS ROCKS EXCAVATIONS PLATES BEARING DEVELOPMENT ALLT NA LAIRIGE SCOTLAND 416 COR&EBPOXDIPNOE CORRESPONDENCE on Papers published in Proceedings, March 1957 Paper No. 6194 Ut-na-Lairige prestressed concrete dam bY James Arthur Banks, O.B.E., M.I.C.E...
Journal Articles
Proceedings of the Institution of Civil Engineers (1957) 6 (3): 428–444.
Published: 01 March 1957
... with the.prestressing worka,nd Mr D. J. Coats, B.Sc., A.M.I.C.E., the Resident Engineerfor the Allt-na-Lairige Scheme. 60. The principal contractors were Marples, Ridgway & Partners, Ltd, London, whose full co-operation in the execution of the work has been very valuable. The Harland EngineeringCo., Ltd, Alloa, werethe...
Journal Articles
Proceedings of the Institution of Civil Engineers (1957) 6 (3): 409–428.
Published: 01 March 1957
...J A BANKS ALLT NA LAIRIGE SCOTLAND UK BANKS ON ALLT-NB-LAIRIQE PRESTRESSED OONCRETE DAM 409 Paper No. 6194 ALLT-NA-LAIRIGEPRESTRESSED CONCRETEDAM bY * James Arthur Banks, O.B.E., M.I.C.E. SYNOPSIS The Allt-na-LairigeScheme of the North of Scotland Hydro-Electric Board includesa dam 73...
Journal Articles
Proceedings of the Institution of Civil Engineers (1955) 4 (6): 753–772.
Published: 01 November 1955
... WATER SUPPLY DRAINAGE LABORATORIES CORROSION TESTS PIPES FAILURES WET STEAM CURING DAMS STEEL GUNITE TANKS PROTECTION WIRE CABLES REGINA ALLT NA LAIRIGE ELLIPSOIDAL CANADA GERMANY CONCRTEOTE WATER SUPPLY AND DRAINAGE 753 10. H. F. Kennison, Design of Prestressed...
Journal Articles
Proceedings of the Institution of Civil Engineers (1955) 4 (6): 725–753.
Published: 01 November 1955
... and actually built in Britain is the Allt-Na-Lairige Dam in Argyllshire, Scotland, for the North of Scotland Hydro-Electric Board. It is 1,360 f t long, 73 ft high above bedrock level, and is expected to be completed towards the end of 1955. Prestressing is being provided by groups of Lee-McCall high-tensile...

or Create an Account

Close subscription notice
Close access options