Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-7 of 7
Keywords: AMBRIC
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
GREATER CAIRO WASTEWATER PROJECT: ORGANIZATION, FINANCIAL ARRANGEMENTS AND CONTRACT STRATEGY.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1985) 78 (4): 729–743.
Published: 01 August 1985
.... Responsibilityforimplementation of the project passed to the General Organisation for Sewerage and Sanitary Drainage and then in August 1981 following a ministerial dectroee the Cairo Wastewater Organisation (CWO). AMBRIC, a consortium of two UK and two USAfirmsofconsultingengineers,assistedbyEgyptianconsultants,EGYCON,were...
Journal Articles
GREATER CAIRO WASTEWATER PROJECT: DESIGN OF EAST BANK STAGE 1 WORKS PU MPING STATIONS, CULVERTS AND TREATMENT PLANT.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1985) 78 (4): 785–805.
Published: 01 August 1985
... DESIGN MANAGEMENT MASTER PLANS TUNNELS GRAVITY FLOW CONCRETE MULTI BARREL ACTIVATED SLUDGE METHODS CORRELATION EFFLUENT THICKENING FACILITIES DRYING POWER FAILURES GROUND SITE INVESTIGATION INVESTIGATIONS LAND DISPOSAL LAYOUT JOHN TAYLOR & SONS AMBRIC BINNIE...
Journal Articles
GREATER CAIRO WASTEWATER PROJECT: DESIGN OF WEST BANK STAGE 1 WORKS SE WERS, CULVERTS AND PUMPING STATIONS.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1985) 78 (4): 831–840.
Published: 01 August 1985
...WD SKINNER; KP PRONSKE © Thomas Telford and ICE 1985 BLACK & VEATCH INTERNATIONAL AMBRIC WASTEWATER PROJECTS DESIGN WORKS SEWERS CULVERTS PUMPING STATIONS COUNTRIES CITIES DEVELOPING TREATMENT PLANT CONSTRUCTION GRAVITY FLOW MULTI BARREL SEWERAGE SEWAGE...
Journal Articles
GREATER CAIRO WASTEWATER PROJECT: HISTORY, DEVELOPMENT AND MANAGEMENT PHILOSOPHY.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1985) 78 (4): 711–728.
Published: 01 August 1985
...DGM ROBERTS; EW FLAXMAN © Thomas Telford and ICE 1985 AMBRIC JOHN TAYLOR & SONS TAYLOR BINNIE & PARTNERS BINNIE & PARTNERS WASTEWATER PROJECTS HISTORY DEVELOPMENT MANAGEMENT WATER DEVELOPING COUNTRIES CITIES SEWERAGE SEWAGE SANITATION SYSTEMS URBAN AREAS...
Journal Articles
GREATER CAIRO WASTEWATER PROJECT: DESIGN OF EAST BANK STAGE 1 WORKS TUNNELS.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1985) 78 (4): 807–829.
Published: 01 August 1985
...IH ELLIOTT; RL SPOLTON © Thomas Telford and ICE 1985 MOTT HAY & ANDERSON AMBRIC BINNIE & PARTNERS WASTEWATER PROJECTS DESIGN WORKS TUNNELS COUNTRIES CITIES DEVELOPING GRAVITY PUMPING STATIONS LIMESTONE WATER TABLES PROPERTIES SUBSURFACE GROUND SHAFTS...
Journal Articles
GREATER CAIRO WASTEWATER PROJECT: REHABILITATION WORKS.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1985) 78 (4): 765–784.
Published: 01 August 1985
..., improve thoeperation of the existing system itnhe interim period. Meeting, 8 October. Written discussion closes 25 October; for further dseeteaipls. (ii). * Associate,CampDresser & McKeeInc.;ChiefEngineer(Rehabilitation),AMBRIC (American-British Consultants). t Senior Engineer, John Taylor & Sons...
Journal Articles
GREATER CAIRO WASTEWATER PROJECT: STUDIES AND MASTER PLAN.
Available to Purchase
Proceedings of the Institution of Civil Engineers (1985) 78 (4): 745–763.
Published: 01 August 1985
...RS DARLING; J DRAKE © Thomas Telford and ICE 1985 BINNIE & PARTNERS TAYLOR BINNIE & PARTNERS JOHN TAYLOR & SONS AMBRIC WASTEWATER PROJECTS STUDIES PLANNING DRAINAGE CITIES DEVELOPING COUNTRIES DEVELOPMENT SANITATION SEWAGE SEWERAGE REPORTS FEASIBILITY...
