Keywords: ARMOURED
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 80 (2): 465–491.
Published: 01 April 1986
... of limestone reefs up to 7 m deep involved blasting and dredging. The outermost 1.6 km of pipeline laid on a sandy seabed in a water depth of up to 20 m, including the 70 port diffuser, was rock armoured. Trenchingin surf zones was also rock backfilled. Nineteen 220 m long pipestrings were pulled out...

or Create an Account

Close Modal
Close Modal