Keywords: BALLAST
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers (1989) 86 (4): 667–707.
Published: 01 August 1989
... minimum 400 Minimum within depots 150 Cubic parabolic form Absolute maximum 3% ; Between 1% and 3% length to be as short as possible Less than 1% length unrestricted Desirable minimum 0.5% Absolute minimum 0.25% Maximum 150 for concrete track, 125 for ballast track Desirable maximum 125 for concrete track...
Journal Articles
Proceedings of the Institution of Civil Engineers (1988) 84 (2): 439–441.
Published: 01 April 1988
...MG REYNOLDS; GD JENKINS; MK SUMMERFIELD © Thomas Telford and ICE 1988 BRITISH RAIL WESTERN REGION LONDON UNDERGROUND LTD WATER DETERIORATION RAILWAYS STRUCTURES TRACK SLEEPERS EMBANKMENTS MAINTENANCE STABILITY TUNNELS UNDERGROUND BALLAST BRISTOL LONDON UK...
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 80 (1): 307–310.
Published: 01 February 1986
.... Missing rail pads and corrugations similarly increase dynamic loads and create excessive vibration causing, for instance, the clip housing to crack the surrounding concrete. In the early stages this can be remedied using epoxyresin. Track ballast has four maifnunctions. (a) Spreading the loadon...
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 80 (1): 111–119.
Published: 01 February 1986
... of changesareincreasingthedangers. On somemain lines maximum train speeds have increased from 100 m.p.h. to 125 m.p.h. and these speeds are attained by more trains and over longer distances. Iist often no longer possible to walk along the cess because of additional ballast laid to prevent buck- 114 S A F E T YI NR A I L W A YE N G...
Journal Articles
Proceedings of the Institution of Civil Engineers (1985) 78 (1): 137–152.
Published: 01 February 1985
... ofballast orarmour rock 12. Failure of the outfall pipe itself can occur if protective rock is removed in largequantitiesand leaves the pipe unprotected. As an example ballast rock removal bywaves from the Camp sBay outfall near Cape Town, South Africa, became so severe that remedial works wereset in motion...
Journal Articles
Proceedings of the Institution of Civil Engineers (1985) 78 (1): 49–84.
Published: 01 February 1985
...RW COLLINGWOOD; TH FENWICK RAILWAYS DIVERSION MAIN LINES CONSTRUCTION SITES MANAGEMENT EARTHWORKS QUALITY CONTROL MONITORING GROUND PERFORMANCE PROBLEMS BRIDGEWORKS PROJECTS DESIGN SUPERSTRUCTURES BALLAST LAYING TRACK TRACKLAYING FORMATION PLANNING GEOLOGY SETTLEMENT...
Journal Articles
Proceedings of the Institution of Civil Engineers (1984) 76 (3): 653–670.
Published: 01 August 1984
... BLASTING BALLAST DRAINAGE EARTHWORKS MANAGEMENT FORMATION RELAYING CATCAIRN BUSHES BURNMOUTH EAST COAST SCOTLAND UK Proc. Instn Civ. Engrs, Part l , 1984,76,Aug., 653-670 PAPER 8815 TRANSPORTATION ENGINEERING GROUP Cliff slope failure at Catcairn Bushes near Burnmouth on the East...
Journal Articles
Proceedings of the Institution of Civil Engineers (1984) 76 (1): 328–331.
Published: 01 February 1984
...AN SCHOFIELD; DM POTTS; CASAGRANDE © Thomas Telford and ICE 1984 CAMBRIDGE UNIVERSITY IMPERIAL COLLEGE LIQUEFACTION OFFSHORE DESIGN WORKS LOADS SOILS LIQUEFIED PORE PRESSURE STRESS RISKS METHODS REDUCTION STRUCTURES BALLAST FAILURES TESTS MECHANISMS DESIGN...
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers (1983) 74 (3): 607–610.
Published: 01 August 1983
... BALLAST INJECTION SYSTEMS SIGNALLING TRAFFIC LOW SIGNALS AUTOMATION URBAN TRANSIT VEHICLES SUSPENSION MAGLEV MAGNETIC LEVITATION DOCKLANDS ECONOMY LOW COST LONDON DOCKLANDS UK f roc. Instn Ciu.Engrs, Part 1, 1983,74,Aug., 607-610 INFORMALDISCUSSION RAILWAYENGINEERSFORUMAND...
Journal Articles
Proceedings of the Institution of Civil Engineers (1983) 74 (2): 317–321.
Published: 01 May 1983
...DL COPE; DE SINCLAIR; AN BEAL; HPJ TAYLOR; WJ SNASDELL; SIR ALAN HARRIS © Thomas Telford and ICE 1983 CONCRETE SUPPORTS RAILWAYS TRACK IN SITU SLABS PRECAST RAILS SEWAGE TRAINS TOILETS EXPERIMENTS SLEEPERS METROS DERAILMENTS DAMAGE BALLAST DISPOSAL CHARING CROSS...
Journal Articles
Proceedings of the Institution of Civil Engineers (1982) 72 (3): 375–392.
Published: 01 August 1982
... for overhead electrification and to eliminate difficult maintenance conditions for ballasted track, and installations on both British Railways and abroad are discussed. Details are given of developments in both the design of the slab and the plant used to install the concrete slabs. Alternative slab track...
Journal Articles
Proceedings of the Institution of Civil Engineers (1982) 72 (1): 115–118.
Published: 01 February 1982
... good quality ballast, concrete sleepers and heavy section rail-were correctly installed and well maintained. Nevertheless, rail force transducers were designed into the system so that excessive stresses could be detected at thecontrol centres. Additionally, at very low temperatures, speed restrictions...
Journal Articles
Proceedings of the Institution of Civil Engineers (1980) 68 (4): 747–758.
Published: 01 November 1980
... THANET SAND THANET GOVERNING STRATA BEARING MODELS BOUNDARY ELEMENTS STRUCTURES PROJECTS LONG TERM MAIN SILLS LAYERS PARAMETRIC VALUE BALLAST STIFFNESS STANDARD MODELLING THAMES LONDON UK QUEEN MARY COLLEGE Proc. Instn Cio. Engrs. Part 1, 1980. 4,Nov., 747-758...
Journal Articles
Proceedings of the Institution of Civil Engineers (1980) 68 (1): 117–125.
Published: 01 February 1980
... that with this detail a transverse joint willbe required at each supporting end where there is a sliding bearingof the stringers and thatis carrying ballasted track. I wouldbeinterested to knowhowthatpracticalproblemhasbeen overcome. 71. LondonTransport has not used load-indicatingwasherson its larger structures...
Journal Articles
Proceedings of the Institution of Civil Engineers (1979) 66 (4): 635–648.
Published: 01 August 1979
...DB SCOTT UK CONCRETE TRACK HISTORY REPLACEMENT PRETENSIONED RAILS NON PRETENSIONED COMPONENTS ECONOMICS MAINTENANCE TESTS SUPPORTS SLEEPERS WAR TIMBER CONTINUOUSLY DESIGN PERFORMANCE BALLAST FACTORS FASTENINGS ACCEPTANCE RAILWAYS DEVELOPMENT WORK MONOBLOCKS...
Journal Articles
Proceedings of the Institution of Civil Engineers (1979) 66 (1): 141–150.
Published: 01 February 1979
... MAINTENANCE RECORDS GEOMETRY MANAGEMENT MANGANESE LATERAL BOGIES PERMANENT WAY RIDEABILITY PROBLEMS COSTS DETERIORATION ADVANCED CLEANING CURVES CONCRETE GROUTING WARNINGS WELDS PANDROL WEAR HST TRACK PLANNING BALLAST PREVENTIVE TRAFFIC CROSSINGS FORCED MOUNTED WHEELS PASSENGERS...
Journal Articles
Proceedings of the Institution of Civil Engineers (1978) 64 (2): 207–225.
Published: 01 May 1978
...RJ COLLINS; J BLACK; JE TYRER © Thomas Telford and ICE 1978 BRITISH RAIL WESTERN REGION HIGH SPEED SPEED REALIGNMENT FOUNDATIONS REMODELLING RESOURCES LABOUR MAINTENANCE STATIONS BALLAST TRACK RAILWAYS SWITCHES CLOSURES STAFF WORKERS REBALLASTING JUNCTIONS WORK...
Journal Articles
Proceedings of the Institution of Civil Engineers (1978) 64 (2): 247.
Published: 01 May 1978
... and to provide accurate information for the critical ballasting condition of the large concrete structures during tow-out. 4. The method described in the Paper involves four load cells, each of 250 t capacity, placed under the support pointsof the module during thelast stages of construction. Some...
Journal Articles
Proceedings of the Institution of Civil Engineers (1975) 58 (2): 263–275.
Published: 01 May 1975
... the widely varying back end of ships. This is a subject in itself. An engineer is very fortunate if he finds two ships with the same type of stern gate and height above the water. It is also said that the pontoon was ballasted to adjust the height. Most ships nowadays can do this for themselves, over quite...

or Create an Account

Close subscription notice
Close access options