Keywords: CATCHMENTS
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers (1991) 91 (3): 593–603.
Published: 01 September 1991
... SATURATION EXCESS FLOW NOMOGRAPHS DISCHARGES PREDICTION PARAMETERS OPTIMISATION EXPERIMENTS CATCHMENTS Proc. Instn Cio. Engrs, Part 2, 1991, 91, Sept. 593-602 PAPER 9717 Dimensionless hillslopehydrology WATER BOARD A. CALVER, BSc, PhD, MIWEM* W. L. WOOD, MA, PhD? Slope discharge and its...
Journal Articles
Proceedings of the Institution of Civil Engineers (1990) 88 (6): 995–1014.
Published: 01 December 1990
...R S MCKENZIE; R B ALLEN © Thomas Telford and ICE 1990 BKS WATER RESOURCES PRETORIA MODERN WATER RESOURCES ASSESSMENT TECHNIQUES RIVERS WATER SUPPLY DEMAND CATCHMENTS ADJACENT YIELD SYSTEMS PLANNING TECHNIQUES METHODS COMPUTERS MODELS RESOURCES SUPPLY ALLOCATION...
Journal Articles
Proceedings of the Institution of Civil Engineers (1989) 87 (1): 131–133.
Published: 01 March 1989
... report,' and a halt should be called. Any method of flood estimation should directly reflect the essential characteristics of the catchment for which there can be no substitute. These were discussed in detail at the 1924 Conferenceat the Institutionof Civil Engineers 56. Few workers in the field would...
Journal Articles
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers (1987) 83 (3): 643–647.
Published: 01 September 1987
... to a detailed upstream catchment model. It requires a downstream measured hydrograph, such as would be recorded at the inlet to a sewage treatment works. Notation i hydrograph i Qi flow rate Q p i peak flow rate t , time tpi time to hydrograph peak DWF dry weather flow Introduction In recent years there hasbeen...
Journal Articles
Proceedings of the Institution of Civil Engineers (1987) 83 (3): 637–641.
Published: 01 September 1987
...-of-river hydro stations, unconnected with a regional electricity grid, where the output was used mainly for crop-processing. This Technical Note describes an empirical method for synthesizing monthly FDCs from limited hydrological data for small-catchment ungauged watercourses. The method involves...
Journal Articles
Proceedings of the Institution of Civil Engineers (1987) 83 (2): 381–396.
Published: 01 June 1987
... catchment characteristics is considered. The two methods of FDC synthesis are tested on independent data, the LFSR method performing slightly better than the catchment equations at Q,, flows but less well at flows above Q,, . Introduction Among its several other recommendations, the Instituotef Hydrology s...
Journal Articles
Proceedings of the Institution of Civil Engineers (1987) 83 (1): 15–32.
Published: 01 March 1987
...JM PARKER; SK BOOTH; SSD FOSTER © Thomas Telford and ICE 1987 BRITISH GEOLOGICAL SURVEY ANGLIAN WATER CHALK PENETRATION NITRATES POLLUTION SOILS AGRICULTURE GROUNDWATER DENITRIFICATION AQUIFERS CATCHMENTS WATER SUPPLY SUPPLY WATER BOREHOLES QUALITY RESEARCH CONTROL...
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 81 (4): 717–719.
Published: 01 December 1986
...DC BLACK; MD MOHD.NOR; BN GUNTER; RB BULMAN; JR DAVIES © Thomas Telford and ICE 1986 BASINS RAINFALL RUNOFF FLOODS CATCHMENTS HYDROLOGY MODELS ROUTING MITIGATION TROPICAL DESIGN VALUE CALIBRATION PARAMETERS METHODS RIVERS ANALYSIS FREQUENCY SOILS MOISTURE BATU...
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 80 (5): 1363–1383.
Published: 01 October 1986
...D J COCHRANE © Thomas Telford and ICE 1986 BRITISH WATERWAYS BOARD MORRISON CONSTRUCTION LTD CANALS LOCKS REPAIRS SILLS STAIRCASES DETERIORATION REPLACEMENT CONCRETE LEVELS LOW WATER COFFERDAMS CATCHMENTS DRY RUNOFF WORKS HEAT GENERATION TEMPERATURE...
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 81 (1): 1–19.
Published: 01 March 1986
...DC BLACK; MD MOHD.NOR; BN GUNTER © Thomas Telford and ICE 1986 SNOWY MOUNTAINS ENGINEERING CORPORATION MINISTRY OF AGRICULTURE, KUALA LUMPUR RAINFALL RUNOFF FLOODS ROUTING MODELS TROPICAL CATCHMENTS STORMWATER CALIBRATION TESTING DATA HISTORICAL PARAMETERS VALUE...
Journal Articles
Proceedings of the Institution of Civil Engineers (1986) 81 (1): 167–170.
Published: 01 March 1986
... to Tynewydd? The mean speed of flood travel in the lower halfof the catchment appears to be about 2.1 1 m/s but in the upper half only about 0.85 m/s. However, the mainstream slope in the upper half is about eight times that of the lower reach. The lags inferred from the unit hydrograph and estimated from...
Journal Articles
Proceedings of the Institution of Civil Engineers (1985) 78 (6): 1471–1475.
Published: 01 December 1985
...DDA PIESOLD; J TATTERSFIELD; CW HODGSON; RB BULMAN; GP SIMS KENYA AFRICA © Thomas Telford and ICE 1985 DAMS RESERVOIRS CATCHMENTS AREAS FLOODS DESIGN SPILLWAYS EXTRAPOLATION ESTIMATING METHODS SLABS MOVEMENT CONDUITS LINERS COSTS SURGES SURGES CHAMBERS MASINGA...
Journal Articles
Proceedings of the Institution of Civil Engineers (1985) 79 (4): 749–751.
Published: 01 December 1985
... enhance the techniquwehich has suffered further from lack of discrimination in the selection of variables and choice of the form of essential factors. 44. Theduration of the rainfall factor selected shouldapproximatetothe critical duration of the catchment area under study. Variations in theaverage annual...
Journal Articles
Proceedings of the Institution of Civil Engineers (1985) 79 (1): 193–201.
Published: 01 March 1985
...DW REED; FORTRAN © Thomas Telford and ICE 1985 INSTITUTE OF HYDROLOGY WALLINGFORD EXTENSIONS S CURVES METHODS CURVES UNITS HYDROGRAPHS TRANSFORMATION TECHNIQUES RAINFALL RIVERS SYNTHESIS ALGORITHMS SITES CATCHMENTS RESPONSES STORMS FLOODS ESTIMATING OSCULATORY...
Journal Articles
Proceedings of the Institution of Civil Engineers (1984) 77 (4): 429–444.
Published: 01 December 1984
... Research Council s Flood Studies Report (1975) to predict mean annual flood Q from catchment characteristics is applied to datain Northern Ireland, a region not used in the equation s original calibration. Using data collected between 1970 and 1982 the equation underpredicts Q at all 17 stations examined...
Journal Articles
Proceedings of the Institution of Civil Engineers (1984) 76 (3): 800–803.
Published: 01 August 1984
... on the catchment was 4 mm, and yetin thecentral 12 hours of the flood the run-off volume was 28 mm. On the neighbouring Coquet catchment thehigh,est recorded floodlevel was notedand on a tributarwyithin the catchment a 5 m high dam was breached as flood waters overtopped the embankment. Mr Archer reported...
Journal Articles
Proceedings of the Institution of Civil Engineers (1984) 76 (3): 779–783.
Published: 01 August 1984
... FLOODS CATCHMENTS SYSTEMS POLICIES CHARTS UK Proc. Instn Ciu.Engrs, Part 1, 1984,76, Aug., 779-783 INFORMALDISCUSSION WATER ENGINEERINGGROUP Hydrological data atWallingford-collection, archiving and application Introducer J. C. RODDA, PhDD, Sc, MIWES, FRMetS* Reporter T. E. Evans, MSc, BSc...
Journal Articles
Proceedings of the Institution of Civil Engineers (1983) 75 (3): 453–473.
Published: 01 September 1983
...HS WHEATER; NC BELL FLOODS STUDIES DEPTH DURATION FREQUENCY RAINFALL STATIONS METHODS DISTRIBUTION ANALYSIS DATA STORMS CATCHMENTS SIMULATION RUNOFF MODELS KINEMATICS FLOW CHANNELS WAVES OVERLAND APPROXIMATION RESPONSES PARAMETERS SENSITIVITY HYDROLOGY HYDROGRAPHS...

or Create an Account

Close subscription notice
Close access options