Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-5 of 5
Keywords: CHARING CROSS
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers (1983) 74 (2): 317–321.
Published: 01 May 1983
...DL COPE; DE SINCLAIR; AN BEAL; HPJ TAYLOR; WJ SNASDELL; SIR ALAN HARRIS © Thomas Telford and ICE 1983 CONCRETE SUPPORTS RAILWAYS TRACK IN SITU SLABS PRECAST RAILS SEWAGE TRAINS TOILETS EXPERIMENTS SLEEPERS METROS DERAILMENTS DAMAGE BALLAST DISPOSAL CHARING CROSS...
Journal Articles
Proceedings of the Institution of Civil Engineers (1981) 70 (1): 182–184.
Published: 01 February 1981
...SJ TAYLOR; I CALLISTER; RW COOKE HYDROTECHNIQUE MICROPILES PALI RADICE UNDERPINNING INSTALLATION CAPACITY MICROPILING ROOT PATTERN PILES EQUIPMENT LOAD BEARING PILING SYSTEMS FOUNDATIONS LOADS TUBES CHARING CROSS LONDON UK Proc. Instn Ch. Engrs, Part 1, 1981...
Journal Articles
EW CUTHBERT, ER HARDING, A NEDEN, B CONSALVES, AC LYONS, KH MOORE, EF HUMPHRIES, MP OREILLY, BL BUBBERS, RA LANGFIELD, R WATTS, AJS BLANCHFIELD
Proceedings of the Institution of Civil Engineers (1980) 68 (1): 131–143.
Published: 01 February 1980
... wilble modernized and prepared for automatictrainoperation (ATO). It is not possible to forecast when Stages I1 and 111 will proceed. 150. Traffic is building up satisfactorily onthetunnel section of the line between BakerStreetand Charing Cross,but its full potential will not be reached unless and until...
Journal Articles
Proceedings of the Institution of Civil Engineers (1979) 66 (3): 375–394.
Published: 01 August 1979
... JUBILEE LINE BAKER STREET BOND STREET ADMIRALTY ARCH ALDWYCH CHARING CROSS UK Proc. lnsm Cio. Engrs, Part 1, 1979, 66, Aug., 375-394 8250 CONTINUED The Jubilee Line 2. Construction from Baker Street to Bond Street exclusive and from Admiralty Arch to Aldwych A description isgivenof...
Journal Articles
Proceedings of the Institution of Civil Engineers (1962) 21 (3): 475–502.
Published: 01 March 1962
.... These were divided into short lengths, with water bars in the joints. The upstream and the downstream sections are connected by a subway under the brick arch of the Waterloo-charing Cross railway viaduct. The construction of this subway immediately adjacetnot shallow viaduct foundations carrying heavy...
